63
8013741/16LH/V1-7/2020-04| SICK
O P E R A T I N G I N S T R U C T I O N S | MCS300P Ex
Subject to change without notice
MAINTENANCE
7
Installing the cell
●
Preferred cell position
– Mount the cell according to the marking made during removal.
Otherwise:
– Gas cell: Gas feed and drain lines from below, heating connection up.
– Liquid cell: Liquid inlet from below, liquid outlet up.
1
Place 1 O-ring each into the groove on the sender or receiver unit (the outer groove
remains empty).
Fig. 21: Installation of cell (shown on the sender unit)
2
Insert the cell: Place the flange ring and cell flange on the flange of the sender or receiver
unit (
3
Turn the cell into the correct position (according to the marking made during removal)
and push the receiver unit to the left or upwards until the cell is clamped.
4
Screw on the cell on the receiver and sender side with 3 screws each (M6x20, DIN 933)
and 2 washers each (DIN 137 and DIN 9021).
Fig. 22: Connecting tube, receiver side
Cell flange
O-ring
Groove
Flange ring
3 screws
Mounting support
Observe torques
(see below)
Receiver unit
Screw connection on
connecting tube, receiver side.
Do the same on the sender side.
4 mounting brackets
with cup springs
on receiver unit