40
FLOWSIC600-XT · Operating Instructions · 8018846/1BHP/V2-1/2021-05 · © SICK Engineering GmbH
Installation
Su
bje
ct to
ch
an
ge
w
ith
ou
t n
otic
e
3.1
Hazards during installation
WARNING:
Hazards during installation work
▸
Do not carry out any welding work on lines with meters fitted.
▸
Comply exactly with mandatory and approved methods.
▸
Observe and comply with regulations of the plant operator.
▸
Meticulously check completed work. Ensure leak tightness.
Otherwise hazards are possible and safe operation is not ensured.
CAUTION:
General risks during installation
▸
Observe applicable valid regulations, general standards and guidelines.
▸
Observe local safety regulations, operating instructions and special
regulations.
▸
Observe the safety information in
▸
Comply with the safety requirements of Pressure Equipment Directive
2014/68/EC or ASME B31.3 when installing pressure devices including
connection of various pressure devices.
▸
Persons carrying out installation work must be familiar with the directives
and standards applicable for pipeline construction and have the
corresponding qualifications, e.g. in accordance with DIN EN 1591-4.