background image

 

28    RN200 user manual

 

 

 

You can always open the circuit breaker. 

When  the  operator  presses  the  RNCB  button,  the  controller  always tries to  open  the  circuit 
breaker  without  load.  Therefore,  it  tries  to  transfer  the  power  from  the  inverters  to  the 
generators (or to the mains) before opening the circuit breaker. If you want to open the RNCB 
circuit breaker immediately (without waiting for the load transfer), just hold the button down for 
at least 1 second. 

If the button is pressed again while the controller is transferring the load to the generators or 
to the mains, the previous opening command is simply cancelled. 

 

The circuit breaker can be closed only if the following conditions are all verified: 

 

There are no blocks. 

 

The  voltages  and  the  frequency  of  the  common  bars  are  within  tolerance  for  an 
appropriate time. 

In fact, closing of the circuit-breaker with voltages on the bars 

out of tolerance is never allowed

 

If no generator is in a "GCB not open" condition (or if this function is disabled). 

If the conditions are verified, the controller commands the closure of RNCB as soon as the 
operator presses the button. 

Note: in this phase the inverters are stopped, because they 

cannot be started if there is no voltage on the connection point (mains or generators).

 

 

The operator can use the START and STOP buttons to control the manual start or stop of the 
inverters, but 

only if

 the controller is in the MAN operating mode. 

As an alternative to the button, the controller also accepts to use: 

 

Commands through the communication ports (two separate commands are provided 
for starting and stopping). 

Note: in MAN RN200 it will never automatically start the inverters; however, it can stop them, 
because its protections are also active in this operating mode. 

 

Inverters can always be stopped. 

When the operator presses the STOP button, the controller always tries to stop the inverters 
without load. It then tries to transfer the power from the inverters to the generators (or to the 
mains) before stopping them. If you want to stop the inverters immediately (without waiting for 
the load transfer), just press the STOP button again. 

If the START button is pressed while the controller is transferring the load to the generators or 
to the mains, the previous stop command is simply cancelled.   

 

Inverters can 

only

 be started if the following conditions are all verified: 

 

There are no blocks. 

 

The RNCB circuit breaker is closed (or does not exist). 

In fact, the inverters can only 

produce power in parallel to another source, which does not happen if RNCB is 
open

Содержание RN200

Страница 1: ...File name EAAM072500EN docx Rev 00 Date 03 08 2020 ID Document EAAM72500 Product RN200...

Страница 2: ...status bar 9 6 5 Display modes 11 6 5 1 Programming P XX 11 6 5 2 PLC L XX 13 6 5 3 Status information S XX 14 6 5 4 Electrical measures M XX 19 6 5 5 Renewable sources R XX 21 6 5 6 Measurements from...

Страница 3: ...rogress or for clarifying or specifying procedures Maintenance of this device must be carried out by qualified personnel in compliance with current regulations in order to avoid damage to people or th...

Страница 4: ...CB circuit breaker connecting one generator to the common bars RNCB circuit breaker that connects a group of renewable sources to the common bars MGCB circuit breaker that connects the common bars to...

Страница 5: ...ual The controller is ready for manual use of renewable sources Press the START button to start the inverters Press the STOP button to stop the inverters Press the RNCB button to open close the RNCB c...

Страница 6: ...HIFT RIGHT to increase the contrast darken Pressed together with the button UP and DOWN Allows to change the brightness of the lamps Allows to change the parameters of 10 units at a time Horizontal na...

Страница 7: ...historical archives force the exit from the BUS OFF mode of the Can Bus etc RNCB In the OFF RESET and AUTO modes the button is disabled In MAN it is used to open and or close the RNCB circuit breaker...

Страница 8: ...mode is REMOTE START The controller is in another operating mode Indicates the presence of at least one alarm Indicates the presence of at least one warning There are no anomalies Indicates that at l...

Страница 9: ...resent but below the tolerance range Flashing 75 on the voltages on the common bars are present but above the tolerance range The RNCB circuit breaker is open The RNCB circuit breaker is closed Flashi...

Страница 10: ...eter P 0499 P 0499 0 blue background P 0499 1 black background P 0499 2 white background The colour of the messages depends on the background colour selected and the type of information displayed The...

Страница 11: ...o a page The title can be replaced with information relating to the status of the system You can do it in three ways By holding down the ESC SHIFT button The title will be shown again when you release...

Страница 12: ...10 RN200 user manual will be displayed for two seconds and then return to display the status message requested by the sequence...

Страница 13: ...SHIFT button the first line 1 is temporarily substituted with a status message Use the and buttons to select the programming mode press them until PROGRAM appears on the display Then press the ACK EN...

Страница 14: ...rm or ESC SHIFT to cancel the change Changing the parameters can be limited by means of four different protection levels listed in order of priority SICES password MANUFACTURER password INSTALLER pass...

Страница 15: ...such as The title and description of the PLC program The date of the last modification The firmware version of PLC compiler and editor The average and maximum execution time These times are automatica...

Страница 16: ...controller i e those inputs whose value is not acquired by the hardware but is determined by the PLC program This page shows the status of all numeric temporary variables AT_XXX available for the PLC...

Страница 17: ...he unique serial number of the controller ID The codes of the currently loaded software on the controller If the main software code is displayed in REVERSE it means that a new version has been downloa...

Страница 18: ...progress o Communication in progress The MAC address of the physical network interface The name under which the controller registered on the network if using DHCP The IP address assigned to the contro...

Страница 19: ...logical status of the input If the DIF 3202 DIF 3204 and DIF 3206 functions are used when the input is activated the controller forces the display of the relative page The page S 11 displays the statu...

Страница 20: ...actually associated with the functions If more than 8 functions are used for the analogue inputs the controller displays them all by rotating them 8 at a time every two seconds holding the ESC SHIFT...

Страница 21: ...various parts of the plant This page is automatically adapted to the real conditions of the system For example the mains and the MCB circuit breaker are automatically hidden if there are no MC200 con...

Страница 22: ...ABLE SOURCES or LOADS is shown at the bottom right in order to identify the real source This page shows the reactive kvar and apparent kVA powers on the single phases and total for single phase system...

Страница 23: ...configured the controller shows them all rotating them on the display every two seconds keep the ESC SHIFT button pressed to stop the rotation on the current display For each inverter it shows Its num...

Страница 24: ...e current display If some measures are not available they are displayed with dashes The upper part contains the total information sum of all inverters This information is always present even if the co...

Страница 25: ...ive on the inverter In this mode the measurements and states acquired by the Can Bus PMCB which connects all the SICES controllers are displayed in a complete way This page shows the list of the contr...

Страница 26: ...ntroller For each MC it shows Its address on PMCB 2 digits The imported or exported active power kW The imported or exported reactive power kvar This page shows the significant data of each RN renewab...

Страница 27: ...e ACK ENTER button to access it Using the and buttons you can scroll through the different records in the archive Each record is identified by a number and by the date and time of storage The number i...

Страница 28: ...arantees the best performance For the configuration of the communication ports and for selecting the type of inverter refer to the technical manual Before proceeding with any type of command both manu...

Страница 29: ...ad the controller must first be in AUTO You can switch to REMOTE START in these ways By configuring a digital input on the controller If this input is active the controller switches to REMOTE START wh...

Страница 30: ...they cannot be started if there is no voltage on the connection point mains or generators The operator can use the START and STOP buttons to control the manual start or stop of the inverters but only...

Страница 31: ...nerators and inverters and therefore generating a black out The concept of SPINNING RESERVE does this It is basically a power reserve that must be guaranteed by the generators they as a whole must be...

Страница 32: ...f value for these parameters should be the consequence of a long term observation of the production of renewable sources in the plant Only in this way is it possible to find the lowest possible value...

Страница 33: ...oller includes a clock calendar used mainly for the functions Weekly working time of the inverters Recording of events with date and time in historical archives The setting of the date time is possibl...

Страница 34: ......

Страница 35: ...the right to modify this document without prior notice SICES has made any effort to ensure that the information herein provide are correct in any case SICES does not assume any liability for the use t...

Отзывы: