USER MANUAL
5
z
Before rigging make sure that the installation area can hold a minimum point
load of 10 times the device’s weight.
z
Always use a certified safety cable that can hold 12 times the weight of the
device when installing the unit. This secondary safety attachment should be
installed in a way that no part of the installation can drop more than 20cm if the
main attachment fails.
z
The device should be well fixed; a free swinging mounting is dangerous and
may not be considered!
z
Do not cover any ventilation openings as this may result in overheating.
z
The operator has to make sure that the safety relating and machine technical
installations are approved by an expert before using them for the first time. The
installations should be inspected every year by a skilled person to be sure that
safety is still optimal.
5.1 Connection to the mains
if you wish to change the power supply settings, see the chapter below.
Connect the fixture to mains with the
enclosed power cord and pulg.
The earth has to be connected!
The occupation of the connection-cables is as follows:
Cable(EU)
Cable(US)
Pin
International
Brown Black Live
L
Liht blue
White
Neutral
N
Yellow/Green Green
Earth
Verify the power supply settings before applying power!
CAUTION EYEDAMAGE: Always position the laser in a way that
prevents the audience from looking directly into the laser beams. The
installation should assure that the beam will not strike the audience.