4 INSTALLATION AND MAINTENANCE/INSPECTION
MUX-100 SERVICE MANUAL
4 - 2
4-2 Installation Procedure
・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・
4-2-1 Flow chart in installation procedure
Fig. 4-1 Flow Chart in
Installation Procedure
Start
Installing CXDI-50G
(Refer to
4-2-9.)
Attachment of arm cover and collimator
rotation stopper
(Refer to 4-2-3.)
Change of connection in accordance with
supply voltage
(Refer to 4-2-4.)
END
YES
NO
Option
?
Installing options
(Refer to Chapter 5 of
Installation Manual)
Attachment of screw caps
(Refer to 4-2-11)
Charging of the battery
(Refer to 4-2-10)
Performance
check
(Refer to 4-2-6.)
Confirmation of PCBs setting (XCONT
PCB etc.)
(Refer to 4-2-5.)
Initial Setting
(Refer to
4-2-7.)
Unpacking
(Refer to 4-2-2)
User Setting
(Refer to
4-2-8.)