![SEW-Eurodrive M1 N Series Скачать руководство пользователя страница 73](http://html1.mh-extra.com/html/sew-eurodrive/m1-n-series/m1-n-series_assembly-and-operating-instructions-manual_1250228073.webp)
6
Startup
Gear unit startup
Assembly and Operating Instructions – M1..N Series Single-Stage Helical Gear Units
73
6.1.1
Run-in period
SEW-EURODRIVE recommends running-in the gear unit as the first phase of startup.
Increase load and revolutions up to maximum level in 2 to 3 steps. The run-in phase
takes approx. 10 hours.
Note the following during the running-in phase:
•
Verify the power values specified on the nameplate because their frequency may
be a decisive factor for the service life of the gear unit.
•
Does the gear unit run smoothly?
•
Are there vibrations or unusual running noises?
•
Are there signs of leakage (lubricants) on the gear unit?
INFORMATION
For further information and troubleshooting measures, refer to the "Malfunctions"
chapter.
29203856/EN – 03/2020
Содержание M1 N Series
Страница 2: ...SEW EURODRIVE Driving the world...
Страница 109: ......
Страница 110: ......
Страница 111: ......