
5
Section One
Installing Y our Scale
SETUP
1.
Locating your scale
The rugged design of your Setra scale ensures that it will withstand most of the
environmental conditions it might encounter. Nonetheless, you should treat your
scale as you would any piece of precision equipment, locating it on a clean, dry
surface; protected where possible from extremes of draft and vibration. The
controller (keyboard and display unit) may be separated from the weighing
platform. This allows the platform to be located on the floor with the keyboard
and display on a table or wall.
2.
Leveling your scale
1. Retract the left rear foot completely into the scale.
2. Adjust the two front feet until the leveling bubble is centered in the circle.
3. Extend the left rear foot until it contacts the mounting surface. Make certain that
all four feet are contacting the mounting surface.
Replace the weighing pan by visually centering the pan on the scale and
pressing in place until well seated. The pan will be seated correctly if it is level on
all sides.
3.
Connecting your scale to an AC outlet
To connect your scale to an AC outlet, insert the appropriate end of the power
cord into an electrical outlet. Now connect the other end into the back of the
scale (see Figure 1). Once you have plugged your scale into a live outlet, it is
automatically on. The scale draws very little current from an outlet, and should
be left connected. This keeps your scale ready to use with no “warm-up” time.
4.
Using the optional internal battery
The internal battery option on Setra CP Model Scales includes one nickel -
cadmium battery pack, an internal battery charger, and a battery on/off switch.
The switch is located on the rear of the platform. (Refer to Figure 1.)
The battery does not come fully charged from the factory. Before using
your scale for the first time, it is necessary to charge the battery.
To charge
the battery, simply plug the scale into an electrical outlet. Fourteen hours is
necessary for a full charge. The battery will charge faster if the battery on/off
switch is in the off position.
Содержание 140CP
Страница 4: ...4 Figure 1 Components and features of the Setra platform scale...
Страница 6: ...6 Figure 2 Detaching the controller...
Страница 49: ...49 Figure 3 Replacing the optional battery pack...
Страница 51: ...51 Figure 4 Replacing the controller cable...