CamCor CT and PRO Series Hardware Manual
37
Section 4
37
Separately-mounted Transmitter
5.28
2.64
Conduit connections
3/4-14 FNPT
(M25)
lb/min
9.06
5.0
4.06
4.72
2.91
2.52
4.92
2.36
6.3
4.88
13.5
2.76
Pipe
U-bolts
9.17
0.79
61.7
6.75
gal/min
Vol Flow
Mass Flow
Conduit connection
3/4-14 FNPT
(M25)
Conduit connections are 3/4-14 FNPT for CSA units and M25 for ATEX units.
Pipe mounting hardware (U-bolts) are furnished as standard accessories. The pipe must be provided by the customer.
Figure 4.18—Outline dimensions (in inches) of separately-mounted transmitter (inches)
Содержание CamCor CC001
Страница 14: ...14 CamCor CT and PRO Series Hardware Manual Section 3 This page is left blank intentionally ...
Страница 24: ...24 CamCor CT and PRO Series Hardware Manual Section 3 This page is left blank intentionally ...
Страница 38: ...38 CamCor CT and PRO Series Hardware Manual Section 4 38 This page is left blank intentionally ...
Страница 54: ...54 CamCor CT and PRO Series Hardware Manual Section 5 This page is left blank intentionally ...
Страница 62: ...62 CamCor CT and PRO Series Hardware Manual Section 7 This page is left blank intentionally ...
Страница 126: ...A 10 CamCor CT and PRO Series Hardware Manual Appendix A This page is left blank intentionally ...