Use a  non-hardening high-temperature silicone sealant (500°F)  to seal
around the horizontal chimney length where it enters through the
exterior of the Wall Thimble or  the concrete wall.

Twist lock a 12" section into the Female Coupler beneath the Support
Plate.  Twist lock the Tee Plug into the bottom of the section. You can
substitute an Insulated Tee Plug (1TPI) for the 12" section.

Chimney Lengths above the Insulated Tee are simply stacked on and
locked with a 1/8 clockwise turn.  It is highly recommended to secure all
exterior chimney joints with Locking Bands (SLB).
For lateral stability of the chimney above the Wall Support, a Wall Band
must be installed along an outside wall.  Install the first Wall Band
midway up the first Chimney Length above the Insulated Tee. Any
additional Wall Bands are to be installed at 8 foot intervals above this
point.

The nut and bolt supplied will fasten the band around the chimney.

Wall Band

Figure 18

Securely fasten the Wall Band around the chimney with the supplied nut
and bolt.  Check for clearances and plumb as you fasten the Wall Bands
to the wall.  Use a level against the chimney section at each support stage
to keep the assembly plumb.

Secure the Wall Band bracket to the wall using two 6d (2”) spiral nails
or #8 x 2" wood screws or longer  if required through the pre-drilled holes
(see Figure 18).  For concrete or brick veneer walls use suitable masonry
fasteners.

ADJUSTABLE INTERMEDIATE

WALL SUPPORT (AIWS)

If the total chimney height exceeds the Wall Support (AWS)  limitations

an Adjustable Intermediate Wall Support must be installed.  Use of an

AIWS will support an additional 38ft. of chimney.  The AIWS is

adjustable from 2" to 2-1/2" only from the vertical wall.  Slide the

assembled Intermediate Wall Support over the protruding length of

chimney.  Fasten the Intermediate Wall Support to the wall using four

1/4” by 2” wood screws through the pre-punched slots in each bracket.

Install the draw band around the protruding chimney length securely

against the support plate.  Install four stainless steel sheet metal screws

firmly into the outer casing of the chimney, through the pre-punched

holes in the draw band.  Cover the heads of the screws with a non-

hardening waterproof caulking.

NOTE:  If a greater adjustment is required, such as to clear an overhang,

the WS Wall Support must be installed.  This support is ordered
separately.

NOTE:  

Interior chimneys installed with a Wall Support must use a

Firestop Radiation Shield (FRS) in place of Wall Bands if extending

through floor/ceiling penetrations and an Attic Insulation Shield when

passing through an unoccupied attic space.

If roof overhangs the wall of the structure so that passage of the

chimney is obstructed, it is necessary to cut an opening in the

overhang.  Allow the minimum 2" air space clearance to combustible.

To find the exact spot where the chimney will pass through the

overhang, drop a plumb line from the underside to the outer edge of the

leveled chimney length.  Mark 5 or 6 points to give an outline of the hole.

Keep in mind the 2" clearance to the chimney outer surface.  Install an

Attic Insulation Shield if space permits on the under side of the

overhang.  If it is not possible, the overhang can be enclosed and a

Rafter Radiation Shield installed at the roof level and a Finishing Plate

on the underside.  If the Attic is open to the overhang, close off the

access with suitable building materials ensuring that a 2" air space

clearance is maintained.   From above, install the Roof Flashing and

Storm Collar by following the Roof  Flashing section in these instructions.

If the overhang is not deep enough to allow the chimney to be fully

installed within the overhang, it will be necessary to cut away a portion

of the overhang.   Ensure that a 2" minimum air space clearance all

around the chimney is established.

  

Framing and flashing the sides of

the opening with suitable sheet metal will be required.  Install a Wall

Band fastened securely to the wall structure directly beneath the

overhang.  The installation of a Universal Roof Brace Kit may be

required if the chimney  exceeds 5 feet or more above the roof.

WALL SUPPORT (WS) - Adjustable up to 6"
from a vertical wall (sold separately)

As previously mentioned, the ideal location for your chimney system

is within the building envelope.  A Wall Support installation is required

when the above mentioned location is not possible.

To complete a proper Wall Support installation, the following parts will

or may be required:

- Wall Support (WS): Intended for a through-the-wall installation where

the chimney has a horizontal connection.  The WS is adjustable  from

2" to 6" from the vertical wall.   NOTE:  The WS is NOT supplied in the

Wall Support Kit.

- Stove Pipe Adaptor (ASE): Transition from chimney to flue pipe.

- Insulated Tee with Insulated Tee Cap: Allowing a horizontal connec-

tion to the chimney.

- Roof  Flashing Assembly: Required when the chimney penetrates a

roof or a roof overhang.

- Rafter Radiation Shield (RRS): Required when the chimney is enclosed

immediately below the roof.

- Wall Band (WB); Universal Wall Band (UWB):Required to provide

lateral support to chimney.

- Suitable Lengths of Chimney: The   chimney diameter should be sized

to suit the appliance.

- Chimney Length: Appropriate length for connection to Tee branch.

- Wall Thimble (WT): Required to pass though a combustible wall.

- Rain Cap: Standard or Deluxe model

The maximum chimney height  above a Wall Support is indicated in Table

4 and illustrated in Figure19, all of which must be above the support.

The Wall Support will allow for an adjustment of  2" to 6" from a vertical

wall.  Threaded studs are factory installed on both side brackets and

the support plate for fast and easy assembly (see

Figure 122).

Ensure the Wall Support Brackets are bolted securely to the wall .

The following steps will assist you in the installation of the Wall Thimble

and of the Wall Support.  Figure 19 shows  a typical Wall Support

installation through a combustible wall.

1. Determine the centre line of  the horizontal connection (Chimney
Length through the wall) and frame an opening to the dimensions

specified for the Wall Thimble in a combustible wall.  See Section A in
Table 3 and Figure 21 (A).

- Use a stud finder to roughly locate the walls studs.  Mark the

Содержание SUPERPRO SPR

Страница 1: ...MBUSTIBLE MATERIALS IT IS OF THE UTMOST IMPORTANCE THAT THIS CHIMNEY SYSTEM BE INSTALLED ONLY IN ACCORDANCE WITH THESE INSTRUCTIONS PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING YOUR INSTALLATION FAIL...

Страница 2: ...RESTOP RADIATION SHIELD INSTALLATION ELBOW INSTALLATION WALL SUPPORT INSTALLATION AWS INTERMEDIATE WALL SUPPORT AIWS WALL SUPPORT INSTALLATION WS WALL BANDS CATHEDRAL CEILING SUPPORT INSTALLATION RAFT...

Страница 3: ...3 SELKIRKCANADACORPORATION SELKIRKCANADACORPORATION 09 29 20 09 29 20 CERTIFICATIONLABELS...

Страница 4: ...udsistypicallyusedinthissituation Thespace betweentheouterwallofthechimneyandtheenclosuremustbealeast aminimumof2inches MAINTAIN A 2 MINIMUM AIR SPACE CLEARANCE BETWEEN INSULATED CHIMNEY SECTIONS AND...

Страница 5: ...ich can affect the operation and or performance of your appliance and or chimney system Plan your installation carefully If possible position the stove so that the flue outlet is between joists rafter...

Страница 6: ...nto the Decorator Ceiling Support and slide the assemblyintotheframedopeningfrombelow Ensurethatthefinishing ringisflushwiththeundersideofthefinishedceilingandtheassembly is level and plumb Secure the...

Страница 7: ...ler Up and apply pressure to compress the adjoining segments together until the overlapped edge of the Adjustable Length extends down to the reference line marked on the standard length Secure by inst...

Страница 8: ...ore securing into place When an Attic Insulation Shield is required above the Decorator CeilingSupportintoanatticasshowninFigure4 ensurethatthebase of the shield is flush with the top of the joist fra...

Страница 9: ...a ChimneyLengths mustpassverticallythroughframedjoistareas Two Story Basement Installation Attic Insulation Shield AIS Firestop Radiation Shield FRS Install an Elbow Support on the first Length just a...

Страница 10: ...ot cleanout section and or the Insulated Tee Plug which is installed below the support Figure 15 Installtheinteriorinnerhalf withroundplateandtabs ofthewallthimble into the inside wall opening ensurin...

Страница 11: ...hole Keep in mind the 2 clearance to the chimney outer surface Install an Attic Insulation Shield if space permits on the under side of the overhang If it is not possible the overhang can be enclosed...

Страница 12: ...oping adjustment from 4 1 2 to 8 3 4 2 For a non combustible wall concrete block or poured foundation cut a hole 3 16 greater in diameter than the outside diameter of the chimney as per Table 3 Break...

Страница 13: ...into the Tee branchbytwistingclockwise ALockingBandmustthenbeinstalled tosecuretheconnection Makesurethenutandboltarefacingdown to prevent any water from collecting in the Locking Band The Tee branch...

Страница 14: ...ew into the nutsert located on the front of the Support Plate see Figures 24 25 and 26 FIGURE 26 Securing of Insulated Tee Cap 14 Use a non hardening high temperature sealant 500 F to seal around the...

Страница 15: ...nstalltheInsulatedTeeCapasper step 15 20 It is required to have a Universal Wall Band UWB installed every 8 feet For systems shorter than 8 at least one Universal Wall Band UWB must be installed 21 Pl...

Страница 16: ...and by screwing four stainless steelsheetmetalscrewsthroughthedrawbandandintotheoutercasing CeilingTrimAngles CeilingTrimAngles Suitablelengthsofchimney Thechimneydiametershouldbesized to suit the app...

Страница 17: ...when exposed to windy conditions NOTE The male coupler of each chimney length must point up RAFTER RADIATION SHIELD RRS ARafterRadiationShield RRS mustbeinstalledwherethechimney is enclosed immediatel...

Страница 18: ...the seam of the cone where it meets the plate Apply a bead of silicone caulking along the back seam of the cone Assemble Chimney Sections through the roof opening and Flashing Ensurethatallsectionsar...

Страница 19: ...legs by sliding the supplied hose clamp over larger diameter leg and then inserting smaller diameter leg into larger diameter leg Temporarily hold legs together by tightening the hose clampoverthecut...

Страница 20: ...o telescoping legs should form an angle of about 60 to give support to the chimney in all directions The angle of the telescoping legs should be approximately 45 from vertical when fastened to the roo...

Страница 21: ...the heating season Where coal is burned the system must be thoroughly cleaned within 48 hours of shutting down the system for the season and all soot be removed from the chimney system This should be...

Страница 22: ...HIMNEY INSTALLATION It may be necessary to offset the chimney in order to clear a joist or an obstacle The three 3 charts below will assist you in selecting the proper combination of elbow angle and c...

Страница 23: ...bands at all joints for added safety and stability This will eliminate the risk of sections becoming undone below the roof line when the Rain Cap is removed when inspections and cleaning of the system...

Страница 24: ...Length 18 ChimneyLength 12 ChimneyLength 6 Chimney Length 12 Adjustable Length Tee with Plug Insulated Tee Cap 15o ElbowKit 30o ElbowKit 45 ElbowKit CeilingSupport WallSupport Kit Intermediate Wall Su...

Страница 25: ..._________________________________________________ DEALER INFO DEALER NAME _______________________________________________________ Address _____________________________________________________________...

Страница 26: ...SI QUE LA GARANTIE DU FABRICANT CONSERVEZ CES DIRECTIVES DANS UN ENDROIT S CURITAIRE AFIN DE POUVOIR VOUS REPORTER AU BESOIN UNE DES CAUSES PRINCIPALES D INCENDIES DE CHEMIN ES EST LE FAIT DE NE PAS M...

Страница 27: ...TALLATION DU COUPE FEU DE SOLIVE INSTALLATION DU COUDE INSTALLATION DU SUPPORT MURAL AWS INSTALLATION SUPPORT MURAL INTERM DIAIRE AIWS INSTALLATION DU SUPPORT MURAL WS BRIDES MURALE INSTALLATION DU SU...

Страница 28: ...3 SELKIRKCANADACORPORATION SELKIRKCANADACORPORATION 09 29 20 09 29 20 TIQUETTESDECERTIFICATION...

Страница 29: ...u elle soit encloisonn e sous la ligne du toit pour la prot ger contre les temp ratures froides ext rieures ceci pourrait r duire la condensation la formation de cr osote et am liorer le tirage Assure...

Страница 30: ...es en vous assurant que le d gagement sp cifi de 2 po 50mm aux combustibles soit maintenu Toutes les ouvertures devraient tre de forme carr e tre d aplomb et en alignement parfait avec chacune des aut...

Страница 31: ...sch mas 4 10 d montrent les deux types d installation les plus courantes pour un support de plafond d coratif Encadrer compl tement l ouverture carr e les 4 c t s selon les dimensions sp cifier au ta...

Страница 32: ...z l isolation du bout femelle de la longueur r glable jusqu ce que l isolation soit de niveau avec la ligne marqu e sur l ext rieur de la longueur sch ma 7 6 Tandis d tre toujours plac avec le bout m...

Страница 33: ...air libre entre le coupe feu solive FRS et la structure des solives TABLEAU D ENCADREMENT POUR LE PARE FEU POUR LE GRENIER DIAM TRE DE CHEMIN E OUVERTURE ENCADR E Tableau 2 Enclos Espace habit Solin...

Страница 34: ...alement par les zones de solives structur es Installation au sous sol pour deux tages cran thermique pour grenier AIS Coupe feu de solive FRS Chapeaudechemin e Placez le second coude coude de retour p...

Страница 35: ...longueurdechemin e install e pr c demmentsurlemanchondut danslabaguemuraleenvousassurantque l accouplement m le sur le t est vers le haut Ins rez et visez l anneau d ancrage dans le bout femelle du t...

Страница 36: ...et installez un coupe feu de solive L ouverture devra tre encadr et un coupe feu radiant install install auniveaudutoit Silegrenierestouvertausoffite fermezl acc savec des mat riaux de construction ap...

Страница 37: ...ouverture 3 16 po plus grande que le diam tre ext rieur de la chemin e selon le tableau 3 Cr er une petite ouverture pour confirmer que le trou sera centr entre les goujons et q aucuns fils lectriques...

Страница 38: ...l espace habit Serrez fermement dans le t en tournant dans le sens horaire Un collier de fixation doit tre install ce raccordement Assurez vous que l crou et le boulon font face vers le bas afin d em...

Страница 39: ...ort S curisez en place avec la vis de fixation dans le nutsert situ l avant de la plaque de soutien voir les sch mas 24 25 et 26 SCH MA 26 Fixation du bouchon de t isol 14 Employez un calfeutrant la s...

Страница 40: ...se tiennent ensemble Installez un collier de fixation pour prot ger en surplus les deux sections de chemin e Sch ma 30 Sch ma 31 Sch ma 32 Bande universelle Attache d espacement Trous pour boulon de...

Страница 41: ...de chemin e ad quates Le diam tre de la chemin e devrait avoir une dimension qui convient l appareil Chapeau de chemin e Mod le r gulier ou deluxe N B Pour r duire l infiltraion d air froid dans le l...

Страница 42: ...u radiant RRS doit tre install o la chemin e est enferm e imm diatement sous la ligne de toit tel que d montr au sch ma 39 Un exemple de ceci est quand l espace de grenier d une maison est employ en t...

Страница 43: ...chaque c t s en utilisant 12 clous avec rondelles en n opr ne ou couvrez les t tes de clous avec un calfeutrage imperm able l eau non durcissant appropri Scellez les bardeaux la plaque de la m me mani...

Страница 44: ...s syst me plus haut un secondaire peut treexig e F Assemblez les jambes t lescopiques en glissant la pince de serrage sur la jambe diam tre sup rieure et ins r e la jambe diam tre inf rieure dans cell...

Страница 45: ...t lescopiques devraient former approximativement un anglede60 pourdonnersupport lachemin edanstouteslesdirections Une fois fix au toit l angle des jambes t lescopiques ne devrait pas d passer 45 de l...

Страница 46: ...ann e Les entr es d air devraient tre ferm es et scell es au besoin pour emp cher l coulement constant d air dans le syst me AVERTISSEMENT NE PAS UTILISER DE MAT RIAUX COMBUSTIBLES CORROSIFS POUR L EN...

Страница 47: ...eurs n cessaires pour obtenir le degr d angle n cessaire dans une hauteur disponible 1 S lectionnez la colonne contenant le diam tre de votre syst me de chemin e 2 D terminez la distance requise pour...

Страница 48: ...fortement recommand d utiliser des colliers de fixation sur toutes les longueurs de chemin e pour une s ret et stabilit suppl mentaire lorsque expos s de forts vent au dessus du toit Ceci liminera au...

Страница 49: ...o Longueur ajustable 12po T et bouchon Bouchon de t isol Ensemble de coude 15o Ensemble de coude 30o Ensemble de coude 45 Support de plafond Supportmural Supportinterm diaire Supportmural Support cath...

Страница 50: ...ION _________________________________________________ INFORMATION DU D TAILLANT NOM DU D TAILLANT _________________________________________________ Adresse ____________________________________________...

Отзывы: