DOCS-001 Manual, SeaBotix Inc. Users, 150 – 200 Series - Rev B – 27 Jan 10 -
Page 41 of 64
Step 23
Remove the shell.
Step 24
Soak the LBV in a container of fresh water or, use a hose
with a low velocity nozzle to rinse the LBV thoroughly.
Reassemble:
Follow the steps in reverse to reassemble the LBV.
4.1.2
Every
50
hours
Every 50 hours of operation require that you push new grease (GLA003 which is
supplied with your order) into the grease galley on each of the (4) thrusters. The
procedure is very simple and will only take approximately 25 minutes to complete.
Step 1
Follow procedure
4.1.1
removing the bumper frame and
shell. Steps 1 to 17.
Step 2
Place the LBV upside down.
Step 3
Remove the trim tab.
Step 4
Remove the (2) M4 x 10 Phillips head screws securing the
rear of the float to the backplane.