Step 4
Tilt camera chassis so primary camera is facing straight down.
Rotate pulley clockwise to stop. This sets the field of vision for
the camera chassis.
Step 5 – 1.5mm Hex Ball Driver
Tighten set screws evenly. Be careful not to over tighten.
Step 6
Wrap drive belt around tilt motor pulley one and one half times
(double wrap, not figure eight).
Step 7
Lower drive belt onto tilt pulley.
Step 8
Test Camera Angle calibration in the programming menu to
ensure the pulley is aligned correctly.
Содержание Generation 2
Страница 1: ...Generation 2 Service Maintenance Procedures Manual ...
Страница 13: ...Once complete follow the procedures to Install Shell Bumper Frame ...
Страница 21: ...Once complete follow the procedures to Install flotation module Install Shell Bumper Frame ...
Страница 50: ...Once complete follow the procedures to Install view port ...
Страница 62: ...Once complete follow the procedures to Install view port ...
Страница 94: ...Step 11 Once programming is complete picture will come up and status will be finished on the computer ...
Страница 97: ...Step 6 1 Phillips Screwdriver Insert and tighten 4 x Phillips counter sunk screws securing back cover to top ...
Страница 101: ...Once complete follow the procedures to Install flotation module Install Shell Bumper frame ...