Step 6
Lift off the port shell and bumper frame assembly.
Note: be careful not to scratch the view port with the crossbar.
Step 7
Turn the LBV over and place on its port side.
Step 8 – 10mm Socket Head Driver
Repeating a similar process to the port shell remove the 10mm
hex nut at the front of the starboard shell.
Step 9 – Phillips #2 Screwdriver
Remove the M4 x 50 Phillips Pan Head screw from the rear of
the shell.
Note: a gray plastic tube acts as a spacer between the shell and
the float. This spacer will fall out when you remove the screw.
Step 10 – Phillips #2 Screwdriver
Remove the 2 M4 x 20 Phillips pan head screws from the top of
the shell.
Note: again you will have to work around the bumper frame.
Содержание Generation 2
Страница 1: ...Generation 2 Service Maintenance Procedures Manual ...
Страница 13: ...Once complete follow the procedures to Install Shell Bumper Frame ...
Страница 21: ...Once complete follow the procedures to Install flotation module Install Shell Bumper Frame ...
Страница 50: ...Once complete follow the procedures to Install view port ...
Страница 62: ...Once complete follow the procedures to Install view port ...
Страница 94: ...Step 11 Once programming is complete picture will come up and status will be finished on the computer ...
Страница 97: ...Step 6 1 Phillips Screwdriver Insert and tighten 4 x Phillips counter sunk screws securing back cover to top ...
Страница 101: ...Once complete follow the procedures to Install flotation module Install Shell Bumper frame ...