Removal
Prior to performing this procedure you must first follow
these procedures:
•
Flotation module removal
•
Shell/Bumper frame removal
Step 1
Place LBV upside down.
Step 2 - #2 Phillips Screwdriver
Remove the 2 Phillips pan head screws securing the vertical
thruster to the thruster elbow.
Step 3
Carefully separate the thruster by pulling straight from the
elbow.
Step 4
Lower the thruster down through the hole in the back plane and
remove.
Содержание Generation 2
Страница 1: ...Generation 2 Service Maintenance Procedures Manual ...
Страница 13: ...Once complete follow the procedures to Install Shell Bumper Frame ...
Страница 21: ...Once complete follow the procedures to Install flotation module Install Shell Bumper Frame ...
Страница 50: ...Once complete follow the procedures to Install view port ...
Страница 62: ...Once complete follow the procedures to Install view port ...
Страница 94: ...Step 11 Once programming is complete picture will come up and status will be finished on the computer ...
Страница 97: ...Step 6 1 Phillips Screwdriver Insert and tighten 4 x Phillips counter sunk screws securing back cover to top ...
Страница 101: ...Once complete follow the procedures to Install flotation module Install Shell Bumper frame ...