Removal
Prior to performing this procedure you must first follow
these procedures:
•
Shell/Bumper frame removal
•
Flotation module removal
Step 1
Make sure all power is off and the umbilical is disconnected
from the LBV vehicle.
Step 2
Place LBV on starboard side.
Step 3 - #2 Phillips Screwdriver
Remove 3 Phillips pan head screws securing Kort nozzle to
port thruster and remove Kort nozzle.
Step 4
Under no circumstances are the 4 M4x10 socket head button
screws to be removed from Starboard Power Can End Cap.
They are potted to the back plane and will cause irreparable
damage if removed.
Содержание Generation 2
Страница 1: ...Generation 2 Service Maintenance Procedures Manual ...
Страница 13: ...Once complete follow the procedures to Install Shell Bumper Frame ...
Страница 21: ...Once complete follow the procedures to Install flotation module Install Shell Bumper Frame ...
Страница 50: ...Once complete follow the procedures to Install view port ...
Страница 62: ...Once complete follow the procedures to Install view port ...
Страница 94: ...Step 11 Once programming is complete picture will come up and status will be finished on the computer ...
Страница 97: ...Step 6 1 Phillips Screwdriver Insert and tighten 4 x Phillips counter sunk screws securing back cover to top ...
Страница 101: ...Once complete follow the procedures to Install flotation module Install Shell Bumper frame ...