21. Vacuum Check
Introduction
The LBV
2
is fitted with a vacuum check valve. This valve is used to check the integrity of the
seals on the main housing and power can when opened or transported commercially. The
quick process provides peace of mind against potential leaking.
Work Environment
Prior to beginning ensure you have a clean and dry workspace. Locate the required tools and
parts and have paper towels available. It is a good idea to have a container to keep fasteners
in as they are removed. Read through the instructions fully prior to beginning and make sure
you understand what they are asking you to do.
Reading Manual
Below is a list of the required tools, estimated time to complete and level of difficulty.
Next to each step where a tool is required the tool is listed. Some of the steps have
special notes that must be observed.
Tools Required
•
#2 Phillips Screwdriver
•
Vacuum Pump
Time to complete
•
11 minutes
Level of Difficulty
•
Easy
•
Perform anytime the
camera housing or
power can are
opened.
Содержание Generation 2
Страница 1: ...Generation 2 Service Maintenance Procedures Manual ...
Страница 13: ...Once complete follow the procedures to Install Shell Bumper Frame ...
Страница 21: ...Once complete follow the procedures to Install flotation module Install Shell Bumper Frame ...
Страница 50: ...Once complete follow the procedures to Install view port ...
Страница 62: ...Once complete follow the procedures to Install view port ...
Страница 94: ...Step 11 Once programming is complete picture will come up and status will be finished on the computer ...
Страница 97: ...Step 6 1 Phillips Screwdriver Insert and tighten 4 x Phillips counter sunk screws securing back cover to top ...
Страница 101: ...Once complete follow the procedures to Install flotation module Install Shell Bumper frame ...