Step 32
Turn LBV over onto port side
Step 33
Push o-ring down to port power can end cap.
Step 34 – O-ring Insertion Tool
Starting from the back press the o-ring between power can
tube and port power can end cap.
Step 35 – O-ring Insertion Tool
Switch sides and work o-ring into groove.
Step 36 – O-ring Insertion Tool
Switch sides and work o-ring into groove.
Содержание Generation 2
Страница 1: ...Generation 2 Service Maintenance Procedures Manual ...
Страница 13: ...Once complete follow the procedures to Install Shell Bumper Frame ...
Страница 21: ...Once complete follow the procedures to Install flotation module Install Shell Bumper Frame ...
Страница 50: ...Once complete follow the procedures to Install view port ...
Страница 62: ...Once complete follow the procedures to Install view port ...
Страница 94: ...Step 11 Once programming is complete picture will come up and status will be finished on the computer ...
Страница 97: ...Step 6 1 Phillips Screwdriver Insert and tighten 4 x Phillips counter sunk screws securing back cover to top ...
Страница 101: ...Once complete follow the procedures to Install flotation module Install Shell Bumper frame ...