Vehicle Power Supply
Introduction
Inside the power can is the vehicle power supply, which is responsible for the power
management and interface for the LBV
2
Work Environment
Prior to beginning ensure you have a clean and dry workspace. Locate the required
tools and parts and have paper towels available. It is a good idea to have a container to
keep fasteners in as they are removed. Read through the instructions fully prior to
beginning and make sure you understand what they are asking you to do.
Be very careful when handling electronics. Use a grounding strap and avoid any static
that may damage the boards.
Reading Manual
Below is a list of the required tools, estimated time to complete and level of difficulty.
Next to each step where a tool is required the tool is listed. Some of the steps have
special notes that must be observed.
Tools Required
•
#2 Phillips Screwdriver
•
3mm Hex Ball Driver
•
Small Straight Blade
Screwdriver
•
O-ring Insertion Tool
•
Silicone Grease
Time to complete
•
20 minutes
•
35 minutes
including other
procedures
Level of Difficulty
•
Moderate
•
Care must be taken in
regards to wiring
Prior to working on the LBV make sure the power is off
and the umbilical is DISCONNECTED.
Содержание Generation 2
Страница 1: ...Generation 2 Service Maintenance Procedures Manual ...
Страница 13: ...Once complete follow the procedures to Install Shell Bumper Frame ...
Страница 21: ...Once complete follow the procedures to Install flotation module Install Shell Bumper Frame ...
Страница 50: ...Once complete follow the procedures to Install view port ...
Страница 62: ...Once complete follow the procedures to Install view port ...
Страница 94: ...Step 11 Once programming is complete picture will come up and status will be finished on the computer ...
Страница 97: ...Step 6 1 Phillips Screwdriver Insert and tighten 4 x Phillips counter sunk screws securing back cover to top ...
Страница 101: ...Once complete follow the procedures to Install flotation module Install Shell Bumper frame ...