MASONRY BRICK INSTALLATION
STEP 1: BASE
Lay a masonry base, minimum 75mm thick (ie. Solid bricks).
The base should be laid on an adequate ground capable of
supporting it’s weight.
**IMPORTANT**
If using the optional Outdoor Air Kit please leave a 125mm air
gap behind the firebox. Refer to Step 5: Outdoor Air Kit.
STEP 2: BACK WALL
Using masonry brick, construct the back wall from the base to
the top of the ceiling.
STEP 3: SHEET METAL LAYER
(OPTIONAL STEP)
Place a thin piece of sheet metal on top of the bricks in order to
level the base and safely manoeuvre the firebox.
Allow a minimum of 100mm on all sides if possible.
*All images from page 17 - 35 are for illustration purposes only and are to be used as a guide only.