OM-610-1002-1
Operator’s Manual
Rev 37
PDS-2010
SECTION 6 MAINTENANCE
page
39
NOTE:
The system base pressure should be regularly monitored. Increases not attributed to vacuum leaks
or outgassing usually indicate a deterioration of the pumping system. Deterioration is usually due to the
passage of process by-products that are not effectively trapped by the cold trap probe. In some instances,
lower cold trap temperatures will alleviate this condition. Normally, the lower system base pressures can
be restored by cleaning the inlet screen at the pump inlet and/or changing the pump oil.
6.1.6 Vacuum Gauge Port
The vacuum gauge is heated to 135°C to protect it from Parylene build-up. However, the small port in the
chamber base to which the gauge is connected is subject to build-up. This port should be regularly inspected
and stripped because polymer build-up could interfere with the vacuum readings.
6.1.7 Vaporizer
The vaporizer and load door are subject to build-up of Parylene dimer film and ash. These areas should be
cleaned whenever a build-up is noted in order to prevent coating contamination.
6.2
LONG TERM INSPECTIONS AND MAINTENANCE
The regularity of these inspections and maintenance is dependent on the amount of use and dimer throughput
encountered by the 2010.
6.2.1 Pyrolysis Tube
After several runs, a yellowish, brittle deposit will be found in the pyrolysis tube. This deposit will be most
prevalent near the inlet port of the chamber base. Typically, this deposit will need to be removed after a dimer
throughput of 300 to 400 grams.
To remove deposit from the pyrolysis tube:
1.
Place a tool under the deposit to separate it from the tube.
2.
Peel or scrape out the deposit.
3.
After removing the build-up, work a wire brush or equivalent through the inside diameter of the pyrolysis
tube to dislodge any remaining debris.
4.
Use a vacuum cleaner to remove any material that may have fallen down the pyrolysis tube. (Access to
the bottom of the pyrolysis section is best achieved through the vaporizer load door.)
6.2.2 O-Rings, Vacuum System Seals
The O-rings at the vaporizer load door and the pyrolysis tube connection at the base of the chamber are
significantly susceptible to high temperature fatigue. The chamber gasket and cold trap O-ring are subject to
abuse from normal day-to-day cleaning and handling. These O-rings and gaskets should be inspected
frequently and replaced as necessary.
A new precision-made system will not ordinarily require grease on its O-rings. As a system ages however,
the accumulation of minute scratches and bits of material in the groove make it harder for the O-ring to
maintain an excellent seal. In such times, it may be helpful to apply
very small amounts
of silicone grease
(pn 20117) to non-heated O-rings. An additional advantage of using the grease on the chamber rings is
that removing parylene deposits will be much easier.
Содержание LABCOTER 2
Страница 3: ...OM 610 1002 1 Operator s Manual Rev 37...
Страница 4: ...Rev 37 Operator s Manual OM 610 1002 1...
Страница 14: ...Rev 37 Operator s Manual OM 610 1002 1 page 6 SECTION 2 OVERVIEW PDS 2010...
Страница 44: ......
Страница 66: ...Rev 37 Operator s Manual OM 610 1002 1 page 58 SECTION 6 MAINTENANCE PDS 2010...
Страница 68: ...Rev 37 Operator s Manual OM 610 1002 1 page 60 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 70: ...Rev 37 Operator s Manual OM 610 1002 1 page 62 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 72: ...Rev 37 Operator s Manual OM 610 1002 1 page 64 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 74: ...Rev 37 Operator s Manual OM 610 1002 1 page 66 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 76: ...Rev 37 Operator s Manual OM 610 1002 1 page 68 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 78: ...Rev 37 Operator s Manual OM 610 1002 1 page 70 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 80: ...Rev 37 Operator s Manual OM 610 1002 1 page 72 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 82: ...Rev 37 Operator s Manual OM 610 1002 1 page 74 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 84: ...Rev 37 Operator s Manual OM 610 1002 1 page 76 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 86: ...Rev 37 Operator s Manual OM 610 1002 1 page 78 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 88: ...Rev 37 Operator s Manual OM 610 1002 1 page 80 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 90: ...Rev 37 Operator s Manual OM 610 1002 1 page 82 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 92: ...Rev 37 Operator s Manual OM 610 1002 1 page 84 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 94: ...Rev 37 Operator s Manual OM 610 1002 1 page 86 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 96: ...Rev 37 Operator s Manual OM 610 1002 1 page 88 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 97: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 89 D50016 VACUUM CHAMBER...
Страница 98: ...Rev 37 Operator s Manual OM 610 1002 1 page 90 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 100: ...Rev 37 Operator s Manual OM 610 1002 1 page 92 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 101: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 93 FP 088 1081 1 REDUCED DOME CHAMBER...
Страница 102: ...Rev 37 Operator s Manual OM 610 1002 1 page 94 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 103: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 95 AD 285 1161 1 TUMBLE KIT 1 OF 3...
Страница 104: ...Rev 37 Operator s Manual OM 610 1002 1 page 96 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 105: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 97 AD 285 1161 1 TUMBLE KIT 2 OF 3...
Страница 106: ...Rev 37 Operator s Manual OM 610 1002 1 page 98 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 107: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 99 AD 285 1161 1 TUMBLE KIT 3 OF 3...
Страница 108: ...Rev 37 Operator s Manual OM 610 1002 1 page 100 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 110: ...Rev 37 Operator s Manual OM 610 1002 1 page 102 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 112: ...Rev 37 Operator s Manual OM 610 1002 1 page 104 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 113: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 105 AD 241 1185 1 FIXTURE 3...
Страница 114: ...Rev 37 Operator s Manual OM 610 1002 1 page 106 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 116: ...Rev 37 Operator s Manual OM 610 1002 1 page 108 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 128: ...Rev 37 Operator s Manual OM 610 1002 1 page 120 SECTION 10 WARRANTY PDS 2010...
Страница 130: ...Rev 37 Operator s Manual OM 610 1002 1 page 122 SECTION 10 WARRANTY PDS 2010...
Страница 131: ...PDS 2010 SCHEMATICS page 123 ES 610 1001 2 CE ELECTRICAL SCHEMATIC 1 OF 2...
Страница 132: ...page 124 SCHEMATICS PDS 2010...
Страница 133: ...PDS 2010 SCHEMATICS page 125 ES 610 1001 2 CE ELECTRICAL SCHEMATIC 2 OF 2...
Страница 134: ...page 126 SCHEMATICS PDS 2010...
Страница 135: ...PDS 2010 SCHEMATICS page 127 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 1 OF 3...
Страница 136: ...page 128 SCHEMATICS PDS 2010...
Страница 137: ...PDS 2010 SCHEMATICS page 129 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 2 OF 3...
Страница 138: ...page 130 SCHEMATICS PDS 2010...
Страница 139: ...PDS 2010 SCHEMATICS page 131 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 3 OF 3...
Страница 140: ...page 132 SCHEMATICS PDS 2010...
Страница 141: ...PDS 2010 SCHEMATICS page 133 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 1 OF 3...
Страница 142: ...page 134 SCHEMATICS PDS 2010...
Страница 143: ...PDS 2010 SCHEMATICS page 135 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 2 OF 3...
Страница 144: ...page 136 SCHEMATICS PDS 2010...
Страница 145: ...PDS 2010 SCHEMATICS page 137 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 3 OF 3...
Страница 146: ...page 138 SCHEMATICS PDS 2010...
Страница 147: ...PDS 2010 SCHEMATICS page 139 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 1 OF 3...
Страница 148: ...page 140 SCHEMATICS PDS 2010...
Страница 149: ...PDS 2010 SCHEMATICS page 141 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 2 OF 3...
Страница 150: ...page 142 SCHEMATICS PDS 2010...
Страница 151: ...PDS 2010 SCHEMATICS page 143 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 3 OF 3...
Страница 152: ...page 144 SCHEMATICS PDS 2010...