
Rev 37
Operator’s Manual
OM-610-1002-1
page 34
SECTION 5 OPERATION
PDS-2010
Figure 8: Baffle Installation
When a large amount of substrate is to be coated, use care to position the substrate to minimize the shadowing
effect that individual parts may have on one another. Also, maintain a minimum spacing requirement of 1/2"
between parts in dense loads.
Rotation of the fixture helps distribution, and rotation is standard for the 2010. Using rotation helps distribute
any non uniformity of the coating over the entire fixture; however, it will not typically help distribution
variances from the top to bottom of the chamber.
5.14.5 Pump Down Time
The time necessary to pump the Deposition Chamber to a low enough pressure to initiate deposition will vary
greatly depending on the amount of substrate and the outgassing associated with the substrate. The pump
down time can vary from less than 15 minutes to 4 hours or more.
5.14.6 Vacuum System Leaks
Small leaks in the vacuum system will increase the pump down time and lower the overall efficiency of the
2010. Relatively large leaks can affect the quality of the Parylene coating.
5.14.7 Baffle
The chamber inlet baffle is extremely important for the even distribution of monomer gas in the deposition
chamber. A warped, damaged, poorly installed, or heavily coated baffle can cause coating thickness variations
and distribution anomalies within the chamber. Use a standard taping scheme in order to provide a consistent,
repeatable method of installing the baffle.
To install a flute baffle, insert a 1.5” long threaded stud (PP-578-1002-0) in the first hole as shown in the
figure below. Use a low residue tape (e.g., Mylar or glass cloth tape) around the area just below the stud
in order to increase the thickness so that the baffle will fit in the furnace chamber. When installing the
baffle in the chamber, make sure that the holes face towards the chamber wall.
5.15 ADHESION PROMOTION (WET PROMOTION)
Silane A-174 is available for adhesion promotion if improved Parylene adhesion is desired. Two types of
AP are possible: 1)Wet Promotion, which is a treatment process that is performed on the product
before
it
is loaded in the coating machine, and 2)In-Chamber Promotion, which is an option offered on some of the
Содержание LABCOTER 2
Страница 3: ...OM 610 1002 1 Operator s Manual Rev 37...
Страница 4: ...Rev 37 Operator s Manual OM 610 1002 1...
Страница 14: ...Rev 37 Operator s Manual OM 610 1002 1 page 6 SECTION 2 OVERVIEW PDS 2010...
Страница 44: ......
Страница 66: ...Rev 37 Operator s Manual OM 610 1002 1 page 58 SECTION 6 MAINTENANCE PDS 2010...
Страница 68: ...Rev 37 Operator s Manual OM 610 1002 1 page 60 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 70: ...Rev 37 Operator s Manual OM 610 1002 1 page 62 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 72: ...Rev 37 Operator s Manual OM 610 1002 1 page 64 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 74: ...Rev 37 Operator s Manual OM 610 1002 1 page 66 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 76: ...Rev 37 Operator s Manual OM 610 1002 1 page 68 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 78: ...Rev 37 Operator s Manual OM 610 1002 1 page 70 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 80: ...Rev 37 Operator s Manual OM 610 1002 1 page 72 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 82: ...Rev 37 Operator s Manual OM 610 1002 1 page 74 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 84: ...Rev 37 Operator s Manual OM 610 1002 1 page 76 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 86: ...Rev 37 Operator s Manual OM 610 1002 1 page 78 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 88: ...Rev 37 Operator s Manual OM 610 1002 1 page 80 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 90: ...Rev 37 Operator s Manual OM 610 1002 1 page 82 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 92: ...Rev 37 Operator s Manual OM 610 1002 1 page 84 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 94: ...Rev 37 Operator s Manual OM 610 1002 1 page 86 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 96: ...Rev 37 Operator s Manual OM 610 1002 1 page 88 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 97: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 89 D50016 VACUUM CHAMBER...
Страница 98: ...Rev 37 Operator s Manual OM 610 1002 1 page 90 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 100: ...Rev 37 Operator s Manual OM 610 1002 1 page 92 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 101: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 93 FP 088 1081 1 REDUCED DOME CHAMBER...
Страница 102: ...Rev 37 Operator s Manual OM 610 1002 1 page 94 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 103: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 95 AD 285 1161 1 TUMBLE KIT 1 OF 3...
Страница 104: ...Rev 37 Operator s Manual OM 610 1002 1 page 96 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 105: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 97 AD 285 1161 1 TUMBLE KIT 2 OF 3...
Страница 106: ...Rev 37 Operator s Manual OM 610 1002 1 page 98 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 107: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 99 AD 285 1161 1 TUMBLE KIT 3 OF 3...
Страница 108: ...Rev 37 Operator s Manual OM 610 1002 1 page 100 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 110: ...Rev 37 Operator s Manual OM 610 1002 1 page 102 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 112: ...Rev 37 Operator s Manual OM 610 1002 1 page 104 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 113: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 105 AD 241 1185 1 FIXTURE 3...
Страница 114: ...Rev 37 Operator s Manual OM 610 1002 1 page 106 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 116: ...Rev 37 Operator s Manual OM 610 1002 1 page 108 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 128: ...Rev 37 Operator s Manual OM 610 1002 1 page 120 SECTION 10 WARRANTY PDS 2010...
Страница 130: ...Rev 37 Operator s Manual OM 610 1002 1 page 122 SECTION 10 WARRANTY PDS 2010...
Страница 131: ...PDS 2010 SCHEMATICS page 123 ES 610 1001 2 CE ELECTRICAL SCHEMATIC 1 OF 2...
Страница 132: ...page 124 SCHEMATICS PDS 2010...
Страница 133: ...PDS 2010 SCHEMATICS page 125 ES 610 1001 2 CE ELECTRICAL SCHEMATIC 2 OF 2...
Страница 134: ...page 126 SCHEMATICS PDS 2010...
Страница 135: ...PDS 2010 SCHEMATICS page 127 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 1 OF 3...
Страница 136: ...page 128 SCHEMATICS PDS 2010...
Страница 137: ...PDS 2010 SCHEMATICS page 129 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 2 OF 3...
Страница 138: ...page 130 SCHEMATICS PDS 2010...
Страница 139: ...PDS 2010 SCHEMATICS page 131 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 3 OF 3...
Страница 140: ...page 132 SCHEMATICS PDS 2010...
Страница 141: ...PDS 2010 SCHEMATICS page 133 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 1 OF 3...
Страница 142: ...page 134 SCHEMATICS PDS 2010...
Страница 143: ...PDS 2010 SCHEMATICS page 135 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 2 OF 3...
Страница 144: ...page 136 SCHEMATICS PDS 2010...
Страница 145: ...PDS 2010 SCHEMATICS page 137 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 3 OF 3...
Страница 146: ...page 138 SCHEMATICS PDS 2010...
Страница 147: ...PDS 2010 SCHEMATICS page 139 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 1 OF 3...
Страница 148: ...page 140 SCHEMATICS PDS 2010...
Страница 149: ...PDS 2010 SCHEMATICS page 141 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 2 OF 3...
Страница 150: ...page 142 SCHEMATICS PDS 2010...
Страница 151: ...PDS 2010 SCHEMATICS page 143 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 3 OF 3...
Страница 152: ...page 144 SCHEMATICS PDS 2010...