Rev 37
Operator’s Manual
OM-610-1002-1
page 32
SECTION 5 OPERATION
PDS-2010
•
Minimize handling of the probe while it is chilled and handle the probe carefully at all times
to avoid mechanical damage to the probe. Do not allow the probe to warm to room
temperature while under vacuum—trapped material may separate from the probe surface
and scatter through the vacuum system when venting. Note that corrosive compounds are
produced (in small amounts) as a byproduct of the Parylene deposition and are condensed
on the probe surface.
•
Regular cleaning is imperative to prevent corrosion and pitting of the probe. See Section 6.
3. The chamber is now ready to be unloaded.
If the 2010 is to be powered down, first pump it down to keep the interior clean. If another coating cycle is to
be performed, continue with the next section.
5.12 SUCCESSIVE
RUNS
If another run is desired, take the following preparations:
1.
After the cold trap probe has been cleaned, re-apply the release agent.
2.
Place the fixture on the chamber base.
WARNING: The chamber base inlet and baffle may be hot
.
3.
After the Vaporizer has cooled below 40°C, load a new charge of Parylene dimer. If you load the
vaporizer before it cools, the Parylene dimer will begin to vaporize immediately; this will lead to pump
down problems and likely degradation of the subsequent coating run. Wear protective gloves if the
vaporizer is hot.
4.
Reseal chamber, cold trap probe, and vaporizer door.
5.
Re-start chilling the cold trap (for 45 minutes or to a temperature of -75°C or below).
6.
Press the PROCESS START/STOP button to start the process.
5.13 SEMI-AUTOMATIC
OPERATION
Semi-automatic operation may be utilized for operator-controlled sequences and paced start-ups. All system
components except for the vaporizer may be controlled independently. The vaporizer will illuminate when
enabled but will not begin heating until:
•
the furnace/gauge tube heaters are within the allowable deviation of their set points
•
the pump output “1” light is on (indicating base pressure has been achieved)
•
the optional protracted pump down time (if used) has elapsed.
As during automatic operation, the ALARM pushbutton can be used to silence the audio alarm after an alarm
has been acknowledged. The operator has 5 minutes to resolve an alarm situation before the system will
automatically secure itself by shutting off all the heaters.
Содержание LABCOTER 2
Страница 3: ...OM 610 1002 1 Operator s Manual Rev 37...
Страница 4: ...Rev 37 Operator s Manual OM 610 1002 1...
Страница 14: ...Rev 37 Operator s Manual OM 610 1002 1 page 6 SECTION 2 OVERVIEW PDS 2010...
Страница 44: ......
Страница 66: ...Rev 37 Operator s Manual OM 610 1002 1 page 58 SECTION 6 MAINTENANCE PDS 2010...
Страница 68: ...Rev 37 Operator s Manual OM 610 1002 1 page 60 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 70: ...Rev 37 Operator s Manual OM 610 1002 1 page 62 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 72: ...Rev 37 Operator s Manual OM 610 1002 1 page 64 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 74: ...Rev 37 Operator s Manual OM 610 1002 1 page 66 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 76: ...Rev 37 Operator s Manual OM 610 1002 1 page 68 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 78: ...Rev 37 Operator s Manual OM 610 1002 1 page 70 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 80: ...Rev 37 Operator s Manual OM 610 1002 1 page 72 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 82: ...Rev 37 Operator s Manual OM 610 1002 1 page 74 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 84: ...Rev 37 Operator s Manual OM 610 1002 1 page 76 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 86: ...Rev 37 Operator s Manual OM 610 1002 1 page 78 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 88: ...Rev 37 Operator s Manual OM 610 1002 1 page 80 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 90: ...Rev 37 Operator s Manual OM 610 1002 1 page 82 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 92: ...Rev 37 Operator s Manual OM 610 1002 1 page 84 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 94: ...Rev 37 Operator s Manual OM 610 1002 1 page 86 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 96: ...Rev 37 Operator s Manual OM 610 1002 1 page 88 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 97: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 89 D50016 VACUUM CHAMBER...
Страница 98: ...Rev 37 Operator s Manual OM 610 1002 1 page 90 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 100: ...Rev 37 Operator s Manual OM 610 1002 1 page 92 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 101: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 93 FP 088 1081 1 REDUCED DOME CHAMBER...
Страница 102: ...Rev 37 Operator s Manual OM 610 1002 1 page 94 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 103: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 95 AD 285 1161 1 TUMBLE KIT 1 OF 3...
Страница 104: ...Rev 37 Operator s Manual OM 610 1002 1 page 96 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 105: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 97 AD 285 1161 1 TUMBLE KIT 2 OF 3...
Страница 106: ...Rev 37 Operator s Manual OM 610 1002 1 page 98 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 107: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 99 AD 285 1161 1 TUMBLE KIT 3 OF 3...
Страница 108: ...Rev 37 Operator s Manual OM 610 1002 1 page 100 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 110: ...Rev 37 Operator s Manual OM 610 1002 1 page 102 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 112: ...Rev 37 Operator s Manual OM 610 1002 1 page 104 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 113: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 105 AD 241 1185 1 FIXTURE 3...
Страница 114: ...Rev 37 Operator s Manual OM 610 1002 1 page 106 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 116: ...Rev 37 Operator s Manual OM 610 1002 1 page 108 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 128: ...Rev 37 Operator s Manual OM 610 1002 1 page 120 SECTION 10 WARRANTY PDS 2010...
Страница 130: ...Rev 37 Operator s Manual OM 610 1002 1 page 122 SECTION 10 WARRANTY PDS 2010...
Страница 131: ...PDS 2010 SCHEMATICS page 123 ES 610 1001 2 CE ELECTRICAL SCHEMATIC 1 OF 2...
Страница 132: ...page 124 SCHEMATICS PDS 2010...
Страница 133: ...PDS 2010 SCHEMATICS page 125 ES 610 1001 2 CE ELECTRICAL SCHEMATIC 2 OF 2...
Страница 134: ...page 126 SCHEMATICS PDS 2010...
Страница 135: ...PDS 2010 SCHEMATICS page 127 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 1 OF 3...
Страница 136: ...page 128 SCHEMATICS PDS 2010...
Страница 137: ...PDS 2010 SCHEMATICS page 129 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 2 OF 3...
Страница 138: ...page 130 SCHEMATICS PDS 2010...
Страница 139: ...PDS 2010 SCHEMATICS page 131 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 3 OF 3...
Страница 140: ...page 132 SCHEMATICS PDS 2010...
Страница 141: ...PDS 2010 SCHEMATICS page 133 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 1 OF 3...
Страница 142: ...page 134 SCHEMATICS PDS 2010...
Страница 143: ...PDS 2010 SCHEMATICS page 135 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 2 OF 3...
Страница 144: ...page 136 SCHEMATICS PDS 2010...
Страница 145: ...PDS 2010 SCHEMATICS page 137 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 3 OF 3...
Страница 146: ...page 138 SCHEMATICS PDS 2010...
Страница 147: ...PDS 2010 SCHEMATICS page 139 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 1 OF 3...
Страница 148: ...page 140 SCHEMATICS PDS 2010...
Страница 149: ...PDS 2010 SCHEMATICS page 141 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 2 OF 3...
Страница 150: ...page 142 SCHEMATICS PDS 2010...
Страница 151: ...PDS 2010 SCHEMATICS page 143 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 3 OF 3...
Страница 152: ...page 144 SCHEMATICS PDS 2010...