
OM-610-1002-1
Operator’s Manual
Rev 37
PDS-2010
SECTION 5 OPERATION
page
15
is determined by the mean free path of the enclosed gas molecules and the dimensions of the container or pipe
diameter.
5.2.5.1 Mean Free Path
The mean free path is basically the average distance that a gas molecule will travel before colliding with
another gas molecule. At atmospheric pressure, the mean free path is about 2 x 10
-6
inch. The mean free path
is inversely proportional to pressure. As the pressure is decreased, the average distance a gas molecule will
travel before colliding with another gas molecule will increase.
5.2.5.2 Flow Regimes
In typical pump down from atmosphere, the vacuum system may pass through all the different flow regimes
(from turbulent to viscous) to transition and ultimately to molecular flow conditions.
Turbulent flow
is usually short lived and associated with the very beginning of a vacuum system being
pumped down. As the vacuum valve is opened, gas begins to flow from the system in a disorderly fashion.
Swirling whirlpools of gas can appear briefly. As things settle down, the turbulence disappears and the gas
leaves the system in an orderly fashion.
Viscous flow
(laminar flow) is the flow of a gas through an enclosure under conditions such that the mean free
path of the gas molecule is very small in comparison to the smallest dimensions of the enclosure. The
character of the flow is determined by gas molecule-to-molecule collisions. The gas leaves the system as any
viscous fluid would with the molecules striking each other and dragging other molecules along with them.
Transition flow
is the flow of gas through an enclosure under conditions such that the mean free path is of the
order as the dimensions of the enclosure. In this flow regime, the flow characteristics are determined by
collisions of the gas molecules with surfaces as well as with other gas molecules. This is the "gray" area
separating viscous flow and molecular flow.
Molecular flow
is the flow of gas through an enclosure under conditions such that the mean free path is much
greater than the dimensions of the enclosure. At these low pressures (high vacuum), the flow characteristics
are determined by collisions of the gas molecules with the enclosure surfaces, and the flow effects from gas
molecule to gas molecule collisions are insignificant. Molecular flow is not really a flow at all; but rather a
random bouncing back and forth of the molecules from wall to wall, with the progress of molecules through
the vacuum system a matter of statistical thermodynamics. The Parylene deposition process occurs between
transitional and molecular flow regimes.
5.2.5.3 Throughput
Throughput in the context of vacuum systems refers to the amount (usually expressed in volume) of gas that
passes a certain point in a given time. The throughput of a vacuum pump at a particular operating pressure is
referred to as pumping speed.
Another related topic to throughput is conductance. Similar to the term in electricity, conductance refers to the
throughput of a gas in relation to the pressure drop across a particular segment of a vacuum system. The
higher the conductance, the easier it is for a gas to flow.
5.2.6 Outgassing
If all the gases to be removed from a vacuum chamber were located exclusively in the free volume bounded
by the vessel walls, system pump down would occur relatively quickly. However, in practice this will never
Содержание LABCOTER 2
Страница 3: ...OM 610 1002 1 Operator s Manual Rev 37...
Страница 4: ...Rev 37 Operator s Manual OM 610 1002 1...
Страница 14: ...Rev 37 Operator s Manual OM 610 1002 1 page 6 SECTION 2 OVERVIEW PDS 2010...
Страница 44: ......
Страница 66: ...Rev 37 Operator s Manual OM 610 1002 1 page 58 SECTION 6 MAINTENANCE PDS 2010...
Страница 68: ...Rev 37 Operator s Manual OM 610 1002 1 page 60 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 70: ...Rev 37 Operator s Manual OM 610 1002 1 page 62 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 72: ...Rev 37 Operator s Manual OM 610 1002 1 page 64 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 74: ...Rev 37 Operator s Manual OM 610 1002 1 page 66 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 76: ...Rev 37 Operator s Manual OM 610 1002 1 page 68 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 78: ...Rev 37 Operator s Manual OM 610 1002 1 page 70 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 80: ...Rev 37 Operator s Manual OM 610 1002 1 page 72 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 82: ...Rev 37 Operator s Manual OM 610 1002 1 page 74 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 84: ...Rev 37 Operator s Manual OM 610 1002 1 page 76 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 86: ...Rev 37 Operator s Manual OM 610 1002 1 page 78 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 88: ...Rev 37 Operator s Manual OM 610 1002 1 page 80 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 90: ...Rev 37 Operator s Manual OM 610 1002 1 page 82 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 92: ...Rev 37 Operator s Manual OM 610 1002 1 page 84 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 94: ...Rev 37 Operator s Manual OM 610 1002 1 page 86 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 96: ...Rev 37 Operator s Manual OM 610 1002 1 page 88 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 97: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 89 D50016 VACUUM CHAMBER...
Страница 98: ...Rev 37 Operator s Manual OM 610 1002 1 page 90 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 100: ...Rev 37 Operator s Manual OM 610 1002 1 page 92 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 101: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 93 FP 088 1081 1 REDUCED DOME CHAMBER...
Страница 102: ...Rev 37 Operator s Manual OM 610 1002 1 page 94 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 103: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 95 AD 285 1161 1 TUMBLE KIT 1 OF 3...
Страница 104: ...Rev 37 Operator s Manual OM 610 1002 1 page 96 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 105: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 97 AD 285 1161 1 TUMBLE KIT 2 OF 3...
Страница 106: ...Rev 37 Operator s Manual OM 610 1002 1 page 98 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 107: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 99 AD 285 1161 1 TUMBLE KIT 3 OF 3...
Страница 108: ...Rev 37 Operator s Manual OM 610 1002 1 page 100 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 110: ...Rev 37 Operator s Manual OM 610 1002 1 page 102 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 112: ...Rev 37 Operator s Manual OM 610 1002 1 page 104 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 113: ...OM 610 1002 1 Operator s Manual Rev 37 PDS 2010 SECTION 7 COMPONENT LOCATION page 105 AD 241 1185 1 FIXTURE 3...
Страница 114: ...Rev 37 Operator s Manual OM 610 1002 1 page 106 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 116: ...Rev 37 Operator s Manual OM 610 1002 1 page 108 SECTION 7 COMPONENT LOCATION PDS 2010...
Страница 128: ...Rev 37 Operator s Manual OM 610 1002 1 page 120 SECTION 10 WARRANTY PDS 2010...
Страница 130: ...Rev 37 Operator s Manual OM 610 1002 1 page 122 SECTION 10 WARRANTY PDS 2010...
Страница 131: ...PDS 2010 SCHEMATICS page 123 ES 610 1001 2 CE ELECTRICAL SCHEMATIC 1 OF 2...
Страница 132: ...page 124 SCHEMATICS PDS 2010...
Страница 133: ...PDS 2010 SCHEMATICS page 125 ES 610 1001 2 CE ELECTRICAL SCHEMATIC 2 OF 2...
Страница 134: ...page 126 SCHEMATICS PDS 2010...
Страница 135: ...PDS 2010 SCHEMATICS page 127 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 1 OF 3...
Страница 136: ...page 128 SCHEMATICS PDS 2010...
Страница 137: ...PDS 2010 SCHEMATICS page 129 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 2 OF 3...
Страница 138: ...page 130 SCHEMATICS PDS 2010...
Страница 139: ...PDS 2010 SCHEMATICS page 131 ES 610 1068 1 DOMESTIC ELECTRICAL SCHEMATIC 3 OF 3...
Страница 140: ...page 132 SCHEMATICS PDS 2010...
Страница 141: ...PDS 2010 SCHEMATICS page 133 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 1 OF 3...
Страница 142: ...page 134 SCHEMATICS PDS 2010...
Страница 143: ...PDS 2010 SCHEMATICS page 135 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 2 OF 3...
Страница 144: ...page 136 SCHEMATICS PDS 2010...
Страница 145: ...PDS 2010 SCHEMATICS page 137 ES 610 1001 5 220V ELECTRICAL SCHEMATIC 3 OF 3...
Страница 146: ...page 138 SCHEMATICS PDS 2010...
Страница 147: ...PDS 2010 SCHEMATICS page 139 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 1 OF 3...
Страница 148: ...page 140 SCHEMATICS PDS 2010...
Страница 149: ...PDS 2010 SCHEMATICS page 141 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 2 OF 3...
Страница 150: ...page 142 SCHEMATICS PDS 2010...
Страница 151: ...PDS 2010 SCHEMATICS page 143 ES 610 1065 1 200V ELECTRICAL SCHEMATIC 3 OF 3...
Страница 152: ...page 144 SCHEMATICS PDS 2010...