Adjustments
Bridge Thickness - For the Service Tech
Only
Push and hold Off till the machine stops.
Access ice thickness sensor.
Check gap between metal tip and evaporator
grid. Small cube standard gap is 3/16 inch,
medium cube standard gap is 7/32 inch. To
set, place a 3/16" (small cube) or 7/32"
(medium cube) drill bit between sensor tip
and evaporator to check. Adjust gap using
adjustment screw.
Restart unit and check ice bridge. Repeat as
needed
Caution: Do not make the bridge too thin or the machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
Water purge setting
The water purge is factory set to Automatic. The setting can be changed to one of 5 manual
settings or left on automatic.
purge
setting
1 -
Minimum
2 -
Moderate
3 -
Standard
4 -
Heavy
5 -
Maximum
A - Automatic
Water
Type
RO water
or
equivalent,
TDS less
than 35
Low TDS
non - RO
water
Setting
for typical
water
High
TDS
water
Very hHigh
TDS water,
greater
than 256
Any with
conductivity
not less than 10
microSiemens/
cm
To set:
Switch the machine OFF by holding the Off button in until a number or the letter
A
shows on
the display.
Press and release the On button repeatedly until the number on the display corresponds to the
desired setting.
Press and release the Off switch again to return to the normal control state.
September 2006 Page 20
Gap
Adjustment
Screw
Содержание C0522SR-1
Страница 96: ...Wiring Diagram C0522R C0530R C0630R C0830R C1030R Single Phase after 9 09 September 2009 Page 96 ...
Страница 98: ...Wiring Diagram C0522R C0530R C0630R C0830R C1030R Three Phase after 9 09 September 2009 Page 98 ...
Страница 126: ...Wiring Diagram C0630R 6 C0830R 6 C1030R 6 September 2009 ...
Страница 127: ...Wiring Diagram C0830R 63 C1030R 63 September 2009 ...