![Scotsman C0522SR-1 Скачать руководство пользователя страница 115](http://html.mh-extra.com/html/scotsman/c0522sr-1/c0522sr-1_technical-manual_1218679115.webp)
17
Open nitrogen bottle and braze compressor suction, discharge and process joints
together. Braze new drier into system.
18
Shut off nitrogen, shut access valves.
19
Evacuate to at least 300 microns.
20
Replace PTCR and run capacitor.
21
Weigh in the nameplate charge. Check for leaks.
22
Reconnect electrical leads.
23
Attach compressor terminal cover.
24
Reconnect electrical power.
25
Return sound shield and front panel to their original positions.
Note: If the compressor is being returned for warranty, braze the stubs shut and tag the compressor with
the required information.
September 2006 Page 115
Refrigeration Removal and Replacement Procedures
Содержание C0522SR-1
Страница 96: ...Wiring Diagram C0522R C0530R C0630R C0830R C1030R Single Phase after 9 09 September 2009 Page 96 ...
Страница 98: ...Wiring Diagram C0522R C0530R C0630R C0830R C1030R Three Phase after 9 09 September 2009 Page 98 ...
Страница 126: ...Wiring Diagram C0630R 6 C0830R 6 C1030R 6 September 2009 ...
Страница 127: ...Wiring Diagram C0830R 63 C1030R 63 September 2009 ...