8. Connect the mains cable on the 12 VDC power supply to the power bar.
9. Connect the power bar to the mains power supply.
WARNING! Electrical Shock Hazard. Use only power cables supplied with
the product. For markets where power cables are not supplied, use only
power cables that are properly rated and certified for the local market.
Do not use cables that are not properly rated and certified.
Tip!
Use cable ties to bundle up unused lengths of cables, as required.
10. Turn on the illuminator.
Change Ion Sources
WARNING! Hot Surface Hazard. Let the NanoSpray
®
ion source cool for at
least 60 minutes before starting any maintenance procedures. Surfaces of
the ion source become hot during operation.
The procedure for changing from a NanoSpray
®
ion source to a Turbo V
TM
, IonDrive
TM
Turbo V, DuoSpray
TM
, or
PhotoSpray
®
ion source varies depending on whether the OptiFlow
TM
interface components are installed on the
mass spectrometer.
• If they are installed, then the nano cell heater assembly and curtain plate must be removed, and the standard
curtain plate installed. Refer to
Change to a Different Ion Source (OptiFlow
.
Note:
Because the orifice plate does not need to be changed, the system need not be shut down and vented.
• If they are not installed, then the NanoSpray
®
interface components must be removed, and the standard
interface components installed. Refer to
Change to a Different Ion Source (NanoSpray
®
The procedure for changing from a different ion source to the NanoSpray
®
ion source also varies depending on
whether the OptiFlow
TM
components are installed.
• If they are installed, then the standard curtain plate must be removed and the nano cell heater assembly and
curtain plate must be installed. Refer to
®
Note:
Because the orifice plate does not need to be changed, the system need not be shut down and vented.
Operator Guide
NanoSpray
®
Ion Source
RUO-IDV-05-0811-F
48 / 92
Ion Source Maintenance