Commissioning and Maintenance
P746/EN
CM/F21
MiCOM P746
(CM) 10-29
7. ON-LOAD
CHECKS
The objectives of the on-load checks are to:
−
Confirm the external wiring to the current inputs is correct.
−
Ensure the on-load differential current is well below the relay setting.
CM
However, these checks can only be carried out if there are no restrictions preventing the
energisation of the plant being protected and the other P746 relays in the group have been
commissioned.
Remove all test leads, temporary shorting leads, etc. and replace any external wiring that
has been removed to allow testing.
If it has been necessary to disconnect any of the external wiring from the relay in order to
perform any of the foregoing tests, it should be ensured that all connections are replaced in
accordance with the relevant external connection or scheme diagram.
Confirm current transformer wiring:
Measure the current transformer secondary values for each input using a multimeter
connected in series with the corresponding relay current input.
Check that the current transformer polarities are correct.
Ensure the current flowing in the neutral circuit of the current transformers is negligible.
Compare the values of the secondary phase currents with the relay’s measured values,
which can be found in the MEASUREMENTS 1 menu column.
Note:
Under normal load conditions the earth fault function will measure
little, if any, current. It is therefore necessary to simulate a phase to
neutral fault. This can be achieved by temporarily disconnecting one
or two of the line current transformer connections to the relay and
shorting the terminals of these current transformer secondary
windings.
If cell [MEASURE’T SETUP, Local Values] is set to ‘Secondary’, the currents displayed on
the LCD or a portable PC connected to the front EIA(RS)232 communication port of the relay
should be equal to the applied secondary current. The values should be within 5% of the
applied secondary currents. However, an additional allowance must be made for the
accuracy of the test equipment being used.
If cell [MEASURE’T SETUP, Local Values] is set to ‘Primary’, the currents displayed on the
relay should be equal to the applied secondary current multiplied by the corresponding
current transformer ratio set in ‘CT & VT RATIOS’ menu column (see Table 5). Again the
values should be within 5% of the expected value, plus an additional allowance for the
accuracy of the test equipment being used.
Note:
If a single dedicated current transformer is used for the earth fault
function, it is not possible to check the relay’s measured values.
Содержание MiCOM P746
Страница 4: ......
Страница 5: ...Pxxx EN SS G11 SAFETY SECTION...
Страница 6: ......
Страница 8: ...Pxxx EN SS G11 Page 2 8 Safety Section BLANK PAGE...
Страница 16: ...P746 EN IT G31 Introduction MiCOM P746...
Страница 18: ...P746 EN IT G31 Introduction IT 1 2 MiCOM P746 IT BLANK PAGE...
Страница 26: ...P746 EN TD G31 Technical Data MiCOM P746...
Страница 38: ...P746 EN GS G31 Getting Started MiCOM P746...
Страница 78: ...P746 EN ST G31 Getting Started MiCOM P746...
Страница 80: ...P746 EN ST G31 Settings ST 4 2 MiCOM P746 ST BLANK PAGE...
Страница 112: ...P746 EN ST G31 Settings ST 4 34 MiCOM P746 ST BLANK PAGE...
Страница 114: ...P746 EN OP G31 Operation MiCOM P746...
Страница 136: ...P746 EN OP G31 Operation OP 5 22 MiCOM P746 OP BLANK PAGE...
Страница 138: ...P746 EN AP G31 Application Notes MiCOM P746...
Страница 142: ...P746 EN AP G31 Application Notes AP 6 4 MiCOM P746 AP BLANK PAGE...
Страница 194: ...P746 EN AP G31 Application Notes AP 6 56 MiCOM P746 AP BLANK PAGE...
Страница 196: ...P746 EN PL G31 Programmable Logic MiCOM P746...
Страница 238: ...P746 EN MR A11 Measurements and Recording MiCOM P746...
Страница 240: ...P746 EN MR A11 Measurements and Recording MR 8 2 MiCOM P746 MR BLANK PAGE...
Страница 258: ...P746 EN FD G31 Firmware Design MiCOM P746...
Страница 280: ......
Страница 342: ...P746 EN CM F21 Commissioning and Maintenance CM 10 62 MiCOM P746 CM Commissioning Engineer Customer Witness Date Date...
Страница 348: ...P746 EN MT A11 Maintenance MiCOM P746...
Страница 350: ...P746 EN MT A11 Maintenance MT 11 2 MiCOM P746 MT BLANK PAGE...
Страница 364: ...P746 EN MT A11 Maintenance MT 11 16 MiCOM P746 MT BLANK PAGE...
Страница 366: ...P746 EN TS G31 Troubleshooting MiCOM P746...
Страница 368: ...P746 EN TS G31 Troubleshooting TS 12 2 MiCOM P746 TS BLANK PAGE...
Страница 382: ...P746 EN SC G31 SCADA Communications MiCOM P746...
Страница 424: ...P746 EN SC G31 SCADA Communications SC 13 42 MiCOM P746 SC BLANK PAGE...
Страница 426: ...P746 EN SG F21 Symbols and Glossary MiCOM P746...
Страница 438: ......
Страница 440: ...P746 EN IN G31 Installation IN 15 2 MiCOM P746 IN BLANK PAGE...
Страница 465: ...Installation P746 EN IN G31 MiCOM P746 IN 15 27 IN 10P74611 1 FIGURE 18 MiCOM P746 80TE WIRING DESCRIPTION P746xxxL...
Страница 468: ......
Страница 470: ...P746 EN HI G31 Remote HMI HI 16 2 MiCOM P746 HI BLANK PAGE...
Страница 500: ...P746 EN HI G31 Remote HMI HI 16 32 MiCOM P746 HI BLANK PAGE...
Страница 502: ......
Страница 504: ...P746 EN CS A11G31 Cyber Security CS 17 2 MiCOM P746 CS BLANK PAGE...
Страница 524: ...P746 EN VH G31 Firmware and Service Manual Version History MiCOM P746...
Страница 529: ......