P746/EN CM/F21
Commissioning and Maintenance
(CM) 10-28
MiCOM P746
For example if tBF4 = 200ms and the fault is cleared in 500ms, the P746 will display 500ms.
6.2.3.4
Internal initiation Breaker Failure Protection
This Breaker failure Protection can be initiated only by a trip command issued by the P746.
Feeder 1
Feeder 2
Coupler
Feeder 3
Feeder 4
P3753ENb
Zone 1
Zone 2
Simulate a busbar fault on the bus-section 2.
Continue to apply fault current in the bus-coupler until the timer tBF1 elapsed.
Check that the retrip signal is given by CT3 and backtrip signal is sent after tBF2.
Check that the P746 issued a trip command to both bus-sections (feeder 1, feeder 2 feeder 4
and feeder 5 should have operated).
The backtrip order is equal to (the maximum between the fault clearance time and 250 ms) –
tBF2 pick-up time.
For example if tBF2 = 150ms and the fault is cleared before 400ms, the displayed value will
be 400ms.
For example if tBF2 = 150ms and the fault is cleared in 500ms, the displayed value will be
500ms.
CM
6.3
Check Application Settings
The settings applied should be carefully checked against the required application-specific
settings to ensure that they are correct, and have not been mistakenly altered during the
injection test.
There are two methods of checking the settings:
−
Extract the settings from the relay using a portable PC running the appropriate
software via the front EIA(RS)232 port, located under the bottom access cover.
Compare the settings transferred from the relay with the original written application-
specific setting record. (For cases where the customer has only provided a printed
copy of the required settings but a portable PC is available).
−
Step through the settings using the relay’s operator interface and compare them with
the original application-specific setting record.
Unless previously agreed to the contrary, the application-specific programmable scheme
logic will not be checked as part of the commissioning tests.
Due to the versatility and possible complexity of the programmable scheme logic, it is
beyond the scope of these commissioning instructions to detail suitable test procedures.
Therefore, when programmable scheme logic tests must be performed, written tests which
will satisfactorily demonstrate the correct operation of the application-specific scheme logic
should be devised by the Engineer who created it. These should be provided to the
Commissioning Engineer together with the digital medium containing the programmable
scheme logic setting file.
Содержание MiCOM P746
Страница 4: ......
Страница 5: ...Pxxx EN SS G11 SAFETY SECTION...
Страница 6: ......
Страница 8: ...Pxxx EN SS G11 Page 2 8 Safety Section BLANK PAGE...
Страница 16: ...P746 EN IT G31 Introduction MiCOM P746...
Страница 18: ...P746 EN IT G31 Introduction IT 1 2 MiCOM P746 IT BLANK PAGE...
Страница 26: ...P746 EN TD G31 Technical Data MiCOM P746...
Страница 38: ...P746 EN GS G31 Getting Started MiCOM P746...
Страница 78: ...P746 EN ST G31 Getting Started MiCOM P746...
Страница 80: ...P746 EN ST G31 Settings ST 4 2 MiCOM P746 ST BLANK PAGE...
Страница 112: ...P746 EN ST G31 Settings ST 4 34 MiCOM P746 ST BLANK PAGE...
Страница 114: ...P746 EN OP G31 Operation MiCOM P746...
Страница 136: ...P746 EN OP G31 Operation OP 5 22 MiCOM P746 OP BLANK PAGE...
Страница 138: ...P746 EN AP G31 Application Notes MiCOM P746...
Страница 142: ...P746 EN AP G31 Application Notes AP 6 4 MiCOM P746 AP BLANK PAGE...
Страница 194: ...P746 EN AP G31 Application Notes AP 6 56 MiCOM P746 AP BLANK PAGE...
Страница 196: ...P746 EN PL G31 Programmable Logic MiCOM P746...
Страница 238: ...P746 EN MR A11 Measurements and Recording MiCOM P746...
Страница 240: ...P746 EN MR A11 Measurements and Recording MR 8 2 MiCOM P746 MR BLANK PAGE...
Страница 258: ...P746 EN FD G31 Firmware Design MiCOM P746...
Страница 280: ......
Страница 342: ...P746 EN CM F21 Commissioning and Maintenance CM 10 62 MiCOM P746 CM Commissioning Engineer Customer Witness Date Date...
Страница 348: ...P746 EN MT A11 Maintenance MiCOM P746...
Страница 350: ...P746 EN MT A11 Maintenance MT 11 2 MiCOM P746 MT BLANK PAGE...
Страница 364: ...P746 EN MT A11 Maintenance MT 11 16 MiCOM P746 MT BLANK PAGE...
Страница 366: ...P746 EN TS G31 Troubleshooting MiCOM P746...
Страница 368: ...P746 EN TS G31 Troubleshooting TS 12 2 MiCOM P746 TS BLANK PAGE...
Страница 382: ...P746 EN SC G31 SCADA Communications MiCOM P746...
Страница 424: ...P746 EN SC G31 SCADA Communications SC 13 42 MiCOM P746 SC BLANK PAGE...
Страница 426: ...P746 EN SG F21 Symbols and Glossary MiCOM P746...
Страница 438: ......
Страница 440: ...P746 EN IN G31 Installation IN 15 2 MiCOM P746 IN BLANK PAGE...
Страница 465: ...Installation P746 EN IN G31 MiCOM P746 IN 15 27 IN 10P74611 1 FIGURE 18 MiCOM P746 80TE WIRING DESCRIPTION P746xxxL...
Страница 468: ......
Страница 470: ...P746 EN HI G31 Remote HMI HI 16 2 MiCOM P746 HI BLANK PAGE...
Страница 500: ...P746 EN HI G31 Remote HMI HI 16 32 MiCOM P746 HI BLANK PAGE...
Страница 502: ......
Страница 504: ...P746 EN CS A11G31 Cyber Security CS 17 2 MiCOM P746 CS BLANK PAGE...
Страница 524: ...P746 EN VH G31 Firmware and Service Manual Version History MiCOM P746...
Страница 529: ......