Local control
Page 5-22
BASE-2-02.05
5.6.1.4. Change grinding quantity ( coffee powder ))
With this function the quantity of coffee powder to be used for each individual coffee
product can be individually specified.
1. Push CHEF card into the card reader.
2. Press or
key till menu:
3. Press product key whose grinding quantity is to be changed:
4. Press
the or
keys to raise or lower the grinding quantity in +/- %.
5. Press
key to confirm the newly set or unchanged value.
6. The grinding quantity is now newly set.
7. Repeat steps 3 to 6 if the grinding quantity is still not right or if there are other products
whose metering must be set.
Press
or
keys to reach the next menu,
draw out CHEF card normal operational readiness.
5.6.1.5. Change filling quantity water and /or milk to coffee products
With this function the water and/or milk quantity to be delivered for each individual
product can be individually specified ( all coffee products and tea water ).
1. Push CHEF card into the card reader.
2. Press or
keys till menu:
3. 3Press product key whose filling quantity is to be changed:
4. Press
the or
keys to raise or lower the filling quantity in +/- %.
5. Press
key to confirm the newly set or unchanged value.
6. The water quantity is now newly set.
Steps 7 to 8 only for products with milk (Frigo option).
For products without milk move on to step 9.
7. Press
the or
keys to raise or lower the filling quantity in +/- %.
8. Press
key to confirm the newly set or unchanged value.
The milk quantity is now newly set.
9. Repeat steps 3 to 6 for water, and steps 3 to 9 for milk, if the filling quantity is still not
right or if there are other products whose metering must be set.
Press or keys to reach the next menu,
or draw out CHEF card normal operational readiness.
change fill quantity
select product
change fill quantity
water quantity 0%
change grinding quanti.
select product
change grinding quanti.
grind qu0%
change fill quantity
milk qu0 %
Содержание Euroca 2
Страница 1: ......
Страница 4: ...Header Page 0 2 BASE 2 02 00...
Страница 10: ...Header Page 0 8 BASE 2 02 00...
Страница 12: ...Introduction Page 1 2 BASE 2 02 01...
Страница 15: ...Product description BASE 2 02 02 Page 2 3 2 1 2 Installation planning...
Страница 20: ...Product description Page 2 8 BASE 2 02 02...
Страница 30: ...Indicating and operating elements Page 3 10 BASSE 2 02 03...
Страница 32: ...Installation and operation of the machine Page 4 2 BASE 2 02 04...
Страница 68: ...Local control Page 5 36 BASE 2 02 05...
Страница 96: ...Index BASE 2 02 09 Page 9 4...