37
6. Finalizing the installation
•
Make sure the gas control valve is “OFF” and the insert / ZC-fireplace is cool prior to conducting service.
•
Remove the face glass panels and the firebox glass panel. See page 42.
•
Install the log set. See page 44. We recommend you purge the gas line at this time (With the glass removed).
This allows gas to be detected once it enters the firebox, ensuring gas does not build up.
•
Turn on the gas. Leak test all gas joints prior to starting the insert / ZC-fireplace. Start the pilot. Replace and
secure the glass panels. See page 42.
•
The main burner. Leak test all joints again.
•
Check the pilot flame to make sure that it reaches both the thermocouple and thermopile. Adjust the pilot
flame if necessary. See page 52.
If the vent configuration is installed incorrectly the vent may cause the flames inside the firebox to lift or “ghost”
– a dangerous situation. Inspect the flames after installation to ensure proper performance. If the vent configura-
tion is correct, yet the flames are lifting or ghosting, shut off the gas to the insert / ZC-fireplace and contact the
dealer for information on remedying the problem.
Turn the flame adjust knob to its highest position – the flames should not be dark in the ends.
Check the flame on low position. The flames should burn out of each burner hole. If the insert / ZC-fireplace does not
work correctly, contact your insert / ZC-fireplace dealer for service.
The flames should
burn right off the top
of the burner ports.
If the flames are lifting, then the
vent configuration is probably
not correct, contact your insert
dealer.
If the flames are ghosting,
then the vent configuration
is probably not correct,
contact your insert dealer
Содержание 70 gas insert / ZC-fireplace
Страница 13: ...13 NOTE In Canada you can install the insert ZC fireplace up to 4500 ft without changing the orifice...
Страница 20: ...20 4 4 Approved venting configurations for vertical terminations Left Damper Right damper...
Страница 32: ...32 Left Damper Right damper...
Страница 33: ...33 5 13 Approved venting configurations for vertical terminations...
Страница 34: ...34 Left Damper Right damper...
Страница 49: ...49...
Страница 60: ...60 Use a 3 mm hexagon key and a 13 mm open end wrench...
Страница 61: ...61 9 3 Wiring diagram for blower 120 Volt Diagram 4...
Страница 64: ...64 11 Safety label...