background image

 

 

 

 

 

 

8

 

 
6.4. CONNECTING BOILER TO HEATING INSTALLATION 
 

The  boiler  should    be    connected  to    heat  in  installation  with  screw  connectors.   
Protecting  measures  for  water  heating  installations  of  opened  type  should  be 
according to detailed regulations being in force in the country of destination. (e.g.PN-
91/B-02413  THE  SAS  UWG    BOILERS  MAY  BE  EMPLOYED  ONLY  IN  THE  
OPEN  SYSTEM  INSTALATIONS,    WITH  PROTECTION  AIDS    ACCORDING  TO 
THE GIVEN STANDARD).   

 

Volume of pressure vessel should be equal at least 4% volume o water in the entire 
heating installation. 
 
 
NOTE:  Ascending  and  descending safety  pipe  as  well  as  circulation pipe  
must    not    be    equipped  with  any  valves.  In  addition,  those  pipes  and  the 
pressure vessel should be protected against freezing. 
 
Boilers of  SAS  UWG  type may  work  with  gravitational or forced  water  circulation. If 
installation  is  provided  with  circulation  pump,  than  on  feeding/return  pipe  the 
differential valve should be installed. When blackout or pump malfunction occurs, this 
valve will open  and the system start work running by gravitation. 
 
NOTE:  It    is    recommended    to    connect    the    boiler    to    heating    system  
provided    with    three-    or    four-pass  valve.    The    main    advantage    of    such  
connection  is  boiler  protection  function  against  low  temperature corrosion, 
preventing it from premature wear. 
 
If  not satisfactory  to  comply with manufacturer’s recommendations  in reference  to  
maintaining  given  heating water temperature ranges occurs (table  TECHNICAL – 
EXPLOITATION  PARAMETERS  p. 10, point 12, 13,  it concerns  in  particular  long-
lasting    return  water  temperature    below    55°C),  then  the  boiler  should  be 
connected  to  the  heating  installation  equipped  with    three-  or  four-pass  valve  
protecting  it  against  low temperature corrosion.

 

 
 
 
 
 
 
 
7.1. FILING WITH WATER
 

 
Boiler  and  the  entire  installation  water  filling  is  to  be  performed  using  blowdown 
connection. 

 

This  activity  should  be  performed  slowly  allowing  the  air  residing  in  the  
installation  to  be removed. 
It  is  accomplished  when water  is  going  out  of  overflow  pipe.  When  filling  the  
heating  system  installation with water it is recommended to loose screw connection 
at  the  place  of  boiler  –  installation  assembly  (on  the  hot  water  connector).    Once 
water is flowing out, tight the connection. 

7.

  

OPERATION AND EXPLOITATION GUIDELINES 

BOILER ASSEMBLY GUIDELINES

Содержание UWG

Страница 1: ...CUMENTATION of water boiler s for heating installations SAS UWG type adopted for black coal combustion of nut coal SAS UWG Z A K A D M E T A L O W O K O T L A R S K I 28 100 Busko Zdr j Owczary ul Prz...

Страница 2: ...r to a chimney 7 6 4 Connecting boiler to a chimney installation 8 7 Operation and installation guidelines 8 7 1 Filing with water 8 7 2 Boiler s firing up 9 Table technical exploitation parameters 10...

Страница 3: ...3...

Страница 4: ...ection Boilers are specifically recommended for the flats heating in single family homes pavilions etc where calculated feeding water temperature does not exceed 85 C and working pressure does not exc...

Страница 5: ...or boilers SAS UWG above 17 kW for boilers up to 14 kW the washout door and load door make up one unit pos 5 6 for boiler s convection channels cleaning In the upper convection section of the boiler t...

Страница 6: ...ical Start Up Documentation 6 1 REQUIREMENTS FOR BOILER ROOM The boiler room where the heating boiler for central heating installation shall be installed must conform the requirements of detailed regu...

Страница 7: ...ed chimney draught of min 0 12 0 30 mbar see tab p 10 point 9 Selection of the chimney s height and section comparing to boiler power should be based on detailed regulations being in force in the coun...

Страница 8: ...ion NOTE It is recommended to connect the boiler to heating system provided with three or four pass valve The main advantage of such connection is boiler protection function against low temperature co...

Страница 9: ...and wood Then thin layer of coal is applied Once the batch of coal is glowing ash box and furnace door should be closed Open fuel load door and fill the combustion chamber with fuel up to the lower ed...

Страница 10: ...5 205 220 260 300 330 9 Required chimney draught mbar 0 30 10 Maximal allowable opperating pressure bar 1 5 11 Maximal allowable working temp C 85 12 Reccomended heating water working temp C 60 80 13...

Страница 11: ...blowdown connection 3 water jacket 10 air intake dosage flap 16 hot water connector pipe 22 thermometer 4 furnace chamber 11 water grates 17 smoke conduit 5 6 washout fuel load door 12 cast iron grate...

Страница 12: ...wdown connection 3 water jacket 10 air intake dosage flap 16 hot water connector pipe 22 thermometer 4 furnace chamber 11 water grates 17 smoke conduit 5 washout door 12 cast iron grates movable 18 sm...

Страница 13: ...ior each boiler s fire up process but not less than after 150 260 of boiler s continuous work Cleaning of convection channels with volatile ashes residues should be performed every 3 7 days depending...

Страница 14: ...its damage all defects of boiler should be immediately removed NOTE The boiler should be regularly cleansed from soot and tarry residues any residue on the convection channels walls disrupts proper h...

Страница 15: ...lements Clean both fumes whirlin elements and fumes channel with boiler s tools Sudden temperature and pressure rise installation valves closed open the valves pressure vessel frozen heat the pressure...

Страница 16: ...ating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boilers need to be transported in the vertical position In order to re...

Страница 17: ...ometer 5 Warranty does not cover consumable items sealant rope 6 Manufacturer is obligated to carry out the charge free repair under warranty in time period of 14 days starting from the date of applic...

Страница 18: ...mentation however basic described properties of the product shall be maintained Any remarks and questions on boiler s SAS type exploitation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Prze...

Страница 19: ...19 SERVICE REPAIRS...

Страница 20: ...mperature boiler of SAS UWG type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Отзывы: