background image

 

 

 

 

 

 

17

 

 

 
 

 

1. Manufacturer  grants  warranty for proper functioning  of the  heating  boiler  SAS 

UWG, what is confirmed with the stamp of  factory.                                                                                                                          

 
2. Manufacturer grants warranty for the period covering

  

the boiler installed and 

operated  according  to  all  terms  and  recommendations  included  to  Technical -
Start-Up Documentation (TSD).                      

 
3. A buyer gets together with terms of warranty hereby Technical-Start-Up-

Documentation (TSD),  which is laid down rules for the proper operation and safe 
exploitation of the  heating  boiler.  Hereby documentation (TSD) must be reading 
careful and it is obligatory. 

 
4. Warranty terms are binding from the date of the purchase for the period of:                                                                                    

a. 4 years for efficient functioning of  the boiler,  
b. 2 years on the heat protective grate,                                                      
c. 2 years on electronics and automation components mounted on the boiler and 

produced by other manufacturers:  

 air draft regulator 

 thermometer 

 

5. Warranty does not cover consumable items:  

 sealant (rope)                                                                                                                             

 
6. Manufacturer is obligated to carry out the charge free repair under warranty in time 

period of 14 days starting from the date of application (done by user).                                                      

 
7. Boiler’s repair, the construction or insulation alterations made by user or other 

third parties – will cause the warranty to be invalid.  
 

8. Application of reclamation should be addressed at manufacturer.   
  
9.  Boiler  replacement  realized  by  manufacturer  is  only  possible  based  o  expert 

opinion, that repair is not workable. 

 

10. If the advertiser does not allow double-warranty repairs, despite the willingness of 

the guarantor to comply with it, is deemed to have resigned from the advertiser 
claims contained in the application of reclamations.                                                                                                             

 

11. In  case  of unfounded  service  summon,  the  customer shell  pay  travelling  and  

work  costs. Before you  call  service,  please  familiarize  yourself  with  the 
chapter  "States  of  improper  boiler’s functioning". We always offer help by 
telephone. 
 

12. Warranty card makes up the only ground for charge free repair. 

 

12

.

  TERMS OF 

WARRANTY

 

 

Содержание UWG

Страница 1: ...CUMENTATION of water boiler s for heating installations SAS UWG type adopted for black coal combustion of nut coal SAS UWG Z A K A D M E T A L O W O K O T L A R S K I 28 100 Busko Zdr j Owczary ul Prz...

Страница 2: ...r to a chimney 7 6 4 Connecting boiler to a chimney installation 8 7 Operation and installation guidelines 8 7 1 Filing with water 8 7 2 Boiler s firing up 9 Table technical exploitation parameters 10...

Страница 3: ...3...

Страница 4: ...ection Boilers are specifically recommended for the flats heating in single family homes pavilions etc where calculated feeding water temperature does not exceed 85 C and working pressure does not exc...

Страница 5: ...or boilers SAS UWG above 17 kW for boilers up to 14 kW the washout door and load door make up one unit pos 5 6 for boiler s convection channels cleaning In the upper convection section of the boiler t...

Страница 6: ...ical Start Up Documentation 6 1 REQUIREMENTS FOR BOILER ROOM The boiler room where the heating boiler for central heating installation shall be installed must conform the requirements of detailed regu...

Страница 7: ...ed chimney draught of min 0 12 0 30 mbar see tab p 10 point 9 Selection of the chimney s height and section comparing to boiler power should be based on detailed regulations being in force in the coun...

Страница 8: ...ion NOTE It is recommended to connect the boiler to heating system provided with three or four pass valve The main advantage of such connection is boiler protection function against low temperature co...

Страница 9: ...and wood Then thin layer of coal is applied Once the batch of coal is glowing ash box and furnace door should be closed Open fuel load door and fill the combustion chamber with fuel up to the lower ed...

Страница 10: ...5 205 220 260 300 330 9 Required chimney draught mbar 0 30 10 Maximal allowable opperating pressure bar 1 5 11 Maximal allowable working temp C 85 12 Reccomended heating water working temp C 60 80 13...

Страница 11: ...blowdown connection 3 water jacket 10 air intake dosage flap 16 hot water connector pipe 22 thermometer 4 furnace chamber 11 water grates 17 smoke conduit 5 6 washout fuel load door 12 cast iron grate...

Страница 12: ...wdown connection 3 water jacket 10 air intake dosage flap 16 hot water connector pipe 22 thermometer 4 furnace chamber 11 water grates 17 smoke conduit 5 washout door 12 cast iron grates movable 18 sm...

Страница 13: ...ior each boiler s fire up process but not less than after 150 260 of boiler s continuous work Cleaning of convection channels with volatile ashes residues should be performed every 3 7 days depending...

Страница 14: ...its damage all defects of boiler should be immediately removed NOTE The boiler should be regularly cleansed from soot and tarry residues any residue on the convection channels walls disrupts proper h...

Страница 15: ...lements Clean both fumes whirlin elements and fumes channel with boiler s tools Sudden temperature and pressure rise installation valves closed open the valves pressure vessel frozen heat the pressure...

Страница 16: ...ating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boilers need to be transported in the vertical position In order to re...

Страница 17: ...ometer 5 Warranty does not cover consumable items sealant rope 6 Manufacturer is obligated to carry out the charge free repair under warranty in time period of 14 days starting from the date of applic...

Страница 18: ...mentation however basic described properties of the product shall be maintained Any remarks and questions on boiler s SAS type exploitation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Prze...

Страница 19: ...19 SERVICE REPAIRS...

Страница 20: ...mperature boiler of SAS UWG type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Отзывы: