background image

 

 

 

 

 

 

5

 

The  water  jacket    (pos.  3)  it  is  a  cuboids  type  with  double  walls    and  water  baffles 
partitions.  Water grates (pos.  11)  together  with  exchanger  constitutes monobloc 
unit –  it is not replaceable. Between the water grates the cast iron movable grates 
are placed (pos. 12). 

To  the  upper section of a heat exchanger a pipe connector for hot water is attached 
(pos.  16),    and  on  the  lower  section,  on  the  back  wall,  the  return  water  pipe 
connector  is  placed    (pos.    20).    Blowdown  connector  (pos.  21)  is  placed  on  the 
sidewall. 
Fuel  load door   (pos.   6),   furnace door   (pos.   7),   are  traditionally  placed  on  
the  front    wall.    Those    door  render  easy  access    for  the    purpose  of  furnace 
chamber  cleaning.   In  the  lower part  of  the ash box  door there is a flap (pos.  
10),  which is  connected  with an  air  draft regulator by  means of a string  (pos. 
14).  It  doses  the  volume  of  air  delivered  to  combustion  process.  Additionally,  on  
the front  wall there  are  the  washout  door (pos.  5  for  boilers  SAS UWG above  
17 kW; for  boilers  up to 14  kW,   the  washout door  and load door  make up one 
unit pos.  5-6),  for  boiler’s convection  channels cleaning. 
In  the  upper,  convection  section  of  the  boiler,  there  is  a  pair  of  pulled  out  
swirls  (pos.  15),  used  for improving the fumes heat recuperation (improving boiler’s 
heat efficiency).  
The  whole heat exchanger  body is  wrapped  with insulation material   (pos.  2),  a 
mineral  wool  type,  filling the space between the heat exchanger and boiler’s casing, 
(pos. 1).  
Water  temperature  In a  boiler  may  be  red  on  the  dial  thermometer  (pos. 22), 
which    is    attached    to  the  boiler.    Boilers    are    adapted    to    operate    with    natural  
fumes    draught    utilization    principle.    Its    exploitation  runs  without  electric  power 
supply, instead, efficient, permeable flue is required. 
 

 
 
 
 

 
 
Basic energetic parameters are  structured in the table (p. 10) and on the drawing  (p. 
11-12). 
 
 
 
 
 
 
 
5.1. FUEL  

 

 
The  basic  fuel  for  heating  boilers    of      SAS      UWG    type  is  a    black  coal    for  
energetic  applications  of  the  nut  grade  (acc.    PN-91/G-04510    type    32.1    class  
24/12).    That    type    of    fuel    guarantees    that    the    declared    power    may    be 
achieved.  
 
 

4.

  

TECHNICAL DATA

 

5.  

FUEL  

Содержание UWG

Страница 1: ...CUMENTATION of water boiler s for heating installations SAS UWG type adopted for black coal combustion of nut coal SAS UWG Z A K A D M E T A L O W O K O T L A R S K I 28 100 Busko Zdr j Owczary ul Prz...

Страница 2: ...r to a chimney 7 6 4 Connecting boiler to a chimney installation 8 7 Operation and installation guidelines 8 7 1 Filing with water 8 7 2 Boiler s firing up 9 Table technical exploitation parameters 10...

Страница 3: ...3...

Страница 4: ...ection Boilers are specifically recommended for the flats heating in single family homes pavilions etc where calculated feeding water temperature does not exceed 85 C and working pressure does not exc...

Страница 5: ...or boilers SAS UWG above 17 kW for boilers up to 14 kW the washout door and load door make up one unit pos 5 6 for boiler s convection channels cleaning In the upper convection section of the boiler t...

Страница 6: ...ical Start Up Documentation 6 1 REQUIREMENTS FOR BOILER ROOM The boiler room where the heating boiler for central heating installation shall be installed must conform the requirements of detailed regu...

Страница 7: ...ed chimney draught of min 0 12 0 30 mbar see tab p 10 point 9 Selection of the chimney s height and section comparing to boiler power should be based on detailed regulations being in force in the coun...

Страница 8: ...ion NOTE It is recommended to connect the boiler to heating system provided with three or four pass valve The main advantage of such connection is boiler protection function against low temperature co...

Страница 9: ...and wood Then thin layer of coal is applied Once the batch of coal is glowing ash box and furnace door should be closed Open fuel load door and fill the combustion chamber with fuel up to the lower ed...

Страница 10: ...5 205 220 260 300 330 9 Required chimney draught mbar 0 30 10 Maximal allowable opperating pressure bar 1 5 11 Maximal allowable working temp C 85 12 Reccomended heating water working temp C 60 80 13...

Страница 11: ...blowdown connection 3 water jacket 10 air intake dosage flap 16 hot water connector pipe 22 thermometer 4 furnace chamber 11 water grates 17 smoke conduit 5 6 washout fuel load door 12 cast iron grate...

Страница 12: ...wdown connection 3 water jacket 10 air intake dosage flap 16 hot water connector pipe 22 thermometer 4 furnace chamber 11 water grates 17 smoke conduit 5 washout door 12 cast iron grates movable 18 sm...

Страница 13: ...ior each boiler s fire up process but not less than after 150 260 of boiler s continuous work Cleaning of convection channels with volatile ashes residues should be performed every 3 7 days depending...

Страница 14: ...its damage all defects of boiler should be immediately removed NOTE The boiler should be regularly cleansed from soot and tarry residues any residue on the convection channels walls disrupts proper h...

Страница 15: ...lements Clean both fumes whirlin elements and fumes channel with boiler s tools Sudden temperature and pressure rise installation valves closed open the valves pressure vessel frozen heat the pressure...

Страница 16: ...ating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boilers need to be transported in the vertical position In order to re...

Страница 17: ...ometer 5 Warranty does not cover consumable items sealant rope 6 Manufacturer is obligated to carry out the charge free repair under warranty in time period of 14 days starting from the date of applic...

Страница 18: ...mentation however basic described properties of the product shall be maintained Any remarks and questions on boiler s SAS type exploitation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Prze...

Страница 19: ...19 SERVICE REPAIRS...

Страница 20: ...mperature boiler of SAS UWG type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Отзывы: