background image

 

 

 

 

 

 

14

 

 
 
 
 
In order to maintain safe operation of boiler following rules  need to be exercised: 

 

keep    the    boiler    in    good    technical    condition    and    its    installation,    in  

particular  take  care  of  the installation tightness, as well as keep sealed  door 
and washout openings,

 

 

keep boiler room tidy, do not stack any objects not related to boiler’s operation,

 

 

in  the  winter  time  do  not  apply  brakes  in  heating  process,  preserving  

water    in    installation  against    freezing.    Especially,    if    the    safety    pipe    is  
frozen    (overflow    pipe)    it    may    be    very  dangerous  because  of  potential 
damage of boiler,

 

 

it  is  forbidden  to  fire  up  a  boiler  by  use  of  petrol,  kerosene,  solvents,  

explosion  may  occur causing he operator to be burned,

 

 

in case of installation malfunction and lacking water in a boiler do not fill it in, if 

boiler is hot, as it may cause its damage,

 

 

all defects of boiler should be immediately removed.

 

 
 

NOTE: The  boiler should  be regularly cleansed  from  soot  and  tarry residues    
–    any    residue  on    the    convection    channels    walls    disrupts    proper    heat  
transfer    from    the    exchanger,  lowering  this  way  an  efficiency  of  device  and 
increases fuel consumption. 
 
 
 
 
 
 

PROBLEM 

CAUSE/SYMPTOM

 

REMEDY

 

Low heat 
capacity of 
device

 

 

gases channels obstructed

 

clean the channels through

 

washout wholes door (prior to 
this pull out whirling elements,  
p. 11-12, pos. 15) 

 

lack of fresh air delivered to

 

boiler room

 

check blow-in ventilation,

 

improve its permeability

 

burning inadequate fuel

 

apply proper quality fuel (see

 

chapter  “Fuel” p.5-6)

 

power of boiler set improperly 

try to regulate the boiler by 
means of  setting an air draft 
regulator or  air dosing flap 
placed in ash box door and  
smoke throttle in the  smoke 
conduit 

boiler power not up to heating 
area

 

 

improper design and erection 
of heating installation

 

 

8. TERMS OF SAFE EXPLOITATION

 

 

9. STATES OF IMPROPER BOILER’S FUNCTIONING

 

 

Содержание UWG

Страница 1: ...CUMENTATION of water boiler s for heating installations SAS UWG type adopted for black coal combustion of nut coal SAS UWG Z A K A D M E T A L O W O K O T L A R S K I 28 100 Busko Zdr j Owczary ul Prz...

Страница 2: ...r to a chimney 7 6 4 Connecting boiler to a chimney installation 8 7 Operation and installation guidelines 8 7 1 Filing with water 8 7 2 Boiler s firing up 9 Table technical exploitation parameters 10...

Страница 3: ...3...

Страница 4: ...ection Boilers are specifically recommended for the flats heating in single family homes pavilions etc where calculated feeding water temperature does not exceed 85 C and working pressure does not exc...

Страница 5: ...or boilers SAS UWG above 17 kW for boilers up to 14 kW the washout door and load door make up one unit pos 5 6 for boiler s convection channels cleaning In the upper convection section of the boiler t...

Страница 6: ...ical Start Up Documentation 6 1 REQUIREMENTS FOR BOILER ROOM The boiler room where the heating boiler for central heating installation shall be installed must conform the requirements of detailed regu...

Страница 7: ...ed chimney draught of min 0 12 0 30 mbar see tab p 10 point 9 Selection of the chimney s height and section comparing to boiler power should be based on detailed regulations being in force in the coun...

Страница 8: ...ion NOTE It is recommended to connect the boiler to heating system provided with three or four pass valve The main advantage of such connection is boiler protection function against low temperature co...

Страница 9: ...and wood Then thin layer of coal is applied Once the batch of coal is glowing ash box and furnace door should be closed Open fuel load door and fill the combustion chamber with fuel up to the lower ed...

Страница 10: ...5 205 220 260 300 330 9 Required chimney draught mbar 0 30 10 Maximal allowable opperating pressure bar 1 5 11 Maximal allowable working temp C 85 12 Reccomended heating water working temp C 60 80 13...

Страница 11: ...blowdown connection 3 water jacket 10 air intake dosage flap 16 hot water connector pipe 22 thermometer 4 furnace chamber 11 water grates 17 smoke conduit 5 6 washout fuel load door 12 cast iron grate...

Страница 12: ...wdown connection 3 water jacket 10 air intake dosage flap 16 hot water connector pipe 22 thermometer 4 furnace chamber 11 water grates 17 smoke conduit 5 washout door 12 cast iron grates movable 18 sm...

Страница 13: ...ior each boiler s fire up process but not less than after 150 260 of boiler s continuous work Cleaning of convection channels with volatile ashes residues should be performed every 3 7 days depending...

Страница 14: ...its damage all defects of boiler should be immediately removed NOTE The boiler should be regularly cleansed from soot and tarry residues any residue on the convection channels walls disrupts proper h...

Страница 15: ...lements Clean both fumes whirlin elements and fumes channel with boiler s tools Sudden temperature and pressure rise installation valves closed open the valves pressure vessel frozen heat the pressure...

Страница 16: ...ating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boilers need to be transported in the vertical position In order to re...

Страница 17: ...ometer 5 Warranty does not cover consumable items sealant rope 6 Manufacturer is obligated to carry out the charge free repair under warranty in time period of 14 days starting from the date of applic...

Страница 18: ...mentation however basic described properties of the product shall be maintained Any remarks and questions on boiler s SAS type exploitation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Prze...

Страница 19: ...19 SERVICE REPAIRS...

Страница 20: ...mperature boiler of SAS UWG type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Отзывы: