5.2. ALTERNATIVE FUEL 
 
The  alternative fuel for  coal  heating  boilers of    SAS    UWG  type  is  a  mixture  of  the 
black  coal  grades  as  follows:  70%  of  coal  the    nut  grade  (    class  24/12    acc.  to  
above mentioned norm)  and  30%   of  coal  the fine  coal  grade (class  21/15  acc. 
to above mentioned norm). For this type of boiler it is not recommended to relay only 
on the fine coal.  
These boilers are also fit for combusting long flame fuels, such as:  brown coal and 
wood in different forms, e.g. chips, silvers, shavings, etc.  

 

The wood has to be seasoned at least one year! 
Wet  wood  combustion  lowers  the  efficiency  and  the  lifetime  of  a  boiler.    It  also 
obstructs the declared power for slow combustion sustainment.  

 

 

 
 

 
 
 
 
Boiler’s assembling  should  be  performed    by  qualified  and  authorized  personnel   
(qualified  person upon adequate training and authorized for performing maintenance 
and repair works). The  fitter’s  obligation  is  to  get  familiar  with  the  product, its  
functioning  and  protection  systems functionality. 

 

 
Prior to boiler’s  assembling  it  is  strictly necessary  to  get familiarized  with  
the content  of  hereby Technical-Start-Up Documentation. 

 
6.1. REQUIREMENTS FOR BOILER-ROOM 

 
The  boiler  room,    where  the  heating  boiler  for  central  heating  installation  shall  be 
installed, must conform the requirements of detailed regulations being in force, at the 
country of destination (e.g. PN-87/B-02411). 

 

In particular, the following requirements shall be fulfilled: 

 

the    boiler    rooms    should    be    located    as    centrally    as    possible    to    rooms  
which  are  covered  with  heating system,  and the boiler itself should be placed 
as close as possible to  chimney  (chimneys),  

 

boiler  room  entrance  door  should  be  opened  on  the  outside,  and    be  made  of 
inflammable materials. 

 

the  boiler  room  should  have  air  blow-in  ventilation,  a  channel    with  section  
no  less  than  50%  of  the chimney  section,    but  not less  than   21   x   21   
cm,   with  the exit at the back  part boiler’s  room,  (lack of such ventilation or 
obstruction may cause: smoking,  inability to get higher temperature),  

 

the  boiler  room  should  have  air  blow-out  ventilation  under  room’s  ceiling  with 
section no less than 25%  of the chimney  section,  but  not less than  14   x   14 
cm (the purpose of  this system is to  carry out   harmful gases).

 

 

NOTE: Employing of  mechanical blow-out ventilation is  unacceptable. 
The boiler room should be provided with day and artificial lighting. 
 

6.

  

BOILER ASSEMBLY GUIDELINES

 

 

Содержание UWG

Страница 1: ...CUMENTATION of water boiler s for heating installations SAS UWG type adopted for black coal combustion of nut coal SAS UWG Z A K A D M E T A L O W O K O T L A R S K I 28 100 Busko Zdr j Owczary ul Prz...

Страница 2: ...r to a chimney 7 6 4 Connecting boiler to a chimney installation 8 7 Operation and installation guidelines 8 7 1 Filing with water 8 7 2 Boiler s firing up 9 Table technical exploitation parameters 10...

Страница 3: ...3...

Страница 4: ...ection Boilers are specifically recommended for the flats heating in single family homes pavilions etc where calculated feeding water temperature does not exceed 85 C and working pressure does not exc...

Страница 5: ...or boilers SAS UWG above 17 kW for boilers up to 14 kW the washout door and load door make up one unit pos 5 6 for boiler s convection channels cleaning In the upper convection section of the boiler t...

Страница 6: ...ical Start Up Documentation 6 1 REQUIREMENTS FOR BOILER ROOM The boiler room where the heating boiler for central heating installation shall be installed must conform the requirements of detailed regu...

Страница 7: ...ed chimney draught of min 0 12 0 30 mbar see tab p 10 point 9 Selection of the chimney s height and section comparing to boiler power should be based on detailed regulations being in force in the coun...

Страница 8: ...ion NOTE It is recommended to connect the boiler to heating system provided with three or four pass valve The main advantage of such connection is boiler protection function against low temperature co...

Страница 9: ...and wood Then thin layer of coal is applied Once the batch of coal is glowing ash box and furnace door should be closed Open fuel load door and fill the combustion chamber with fuel up to the lower ed...

Страница 10: ...5 205 220 260 300 330 9 Required chimney draught mbar 0 30 10 Maximal allowable opperating pressure bar 1 5 11 Maximal allowable working temp C 85 12 Reccomended heating water working temp C 60 80 13...

Страница 11: ...blowdown connection 3 water jacket 10 air intake dosage flap 16 hot water connector pipe 22 thermometer 4 furnace chamber 11 water grates 17 smoke conduit 5 6 washout fuel load door 12 cast iron grate...

Страница 12: ...wdown connection 3 water jacket 10 air intake dosage flap 16 hot water connector pipe 22 thermometer 4 furnace chamber 11 water grates 17 smoke conduit 5 washout door 12 cast iron grates movable 18 sm...

Страница 13: ...ior each boiler s fire up process but not less than after 150 260 of boiler s continuous work Cleaning of convection channels with volatile ashes residues should be performed every 3 7 days depending...

Страница 14: ...its damage all defects of boiler should be immediately removed NOTE The boiler should be regularly cleansed from soot and tarry residues any residue on the convection channels walls disrupts proper h...

Страница 15: ...lements Clean both fumes whirlin elements and fumes channel with boiler s tools Sudden temperature and pressure rise installation valves closed open the valves pressure vessel frozen heat the pressure...

Страница 16: ...ating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boilers need to be transported in the vertical position In order to re...

Страница 17: ...ometer 5 Warranty does not cover consumable items sealant rope 6 Manufacturer is obligated to carry out the charge free repair under warranty in time period of 14 days starting from the date of applic...

Страница 18: ...mentation however basic described properties of the product shall be maintained Any remarks and questions on boiler s SAS type exploitation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Prze...

Страница 19: ...19 SERVICE REPAIRS...

Страница 20: ...mperature boiler of SAS UWG type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Отзывы: