6.2. BOILER ARRANGEMENT 
 

Special foundation for boiler is not required, however it is  recommended  to put it on 
concrete platform 2 cm  high,  but  it  may  be  also  practiced  to  put  it  directly  on  
the  fire-proof  floor.  Boiler’s  layout  should ensure  easy  and  safe  operation  of  
such    elements,    as    furnace,    ash    box    and    fuel    loading,    and    do    not  obstruct 
cleaning operations.  

 

The  front  of  boiler  should  be  distant  from  the  opposite  wall  no  less  than  2  
m,  and  similarly,  boiler’s sidewalls no less than 0.5 m.  

 
 
6.3. CONNECTING BOILER TO THE CHIMNEY
 
 

Chimney    channel    and    connection    should    be    performed    according    to    the  
requirements    of  detailed  regulations  being  currently  in  force  in  the  country  of 
destination  (e.g.  Ministry of Infrastructure Decree, as of 1 April 2002 Journal of acts 
no. 75). 
A    boiler  should  be  connected    with    smoke    conduit,        which    is    slightly    rising  
towards    the  chimney.  Smoke  conduit    length  should  not  exceed    0.5    m.  Area    of 
chimney – smoke  conduit connection should be precisely sealed. Area  of chimney – 
smoke conduit connection should be precisely sealed.  
 
The  chimney’s  height  and  section,  as  well  as  accurateness  of  its  construction  
shall  ensure  obtaining required chimney draught of min. 0.12 – 0.30 mbar (see tab. 
p.10, point 9). 
Selection of   the  chimney’s height and section comparing to boiler power should be 
based on detailed regulations being in force in the country of destination. 
Assuming  that  it  is  not  possible  to  achieve  such  parameters  for  chimney,  and  
chimney    draught  problems    are    experienced,    resulting    in    improper    boiler  
performance,  the  gases  blow-out  fan,  or chimney base together with built-in fan 
may  be  applied,  for  supporting  and  stabilizing  the  draught.  It  is    important    for  the 
chimney  to  has  its  beginning  at  the  level  of    boiler  room  floor,    for  the  reason  that 
gases  leaving  the  boiler    are  able  to  be  repelled.  It  is  also  important,    that  in  the 
bottom part of chimney there is washout whole with tight closing.  
In order  to  avoid the  air  back draught possibly appearing  in the chimney, its height 
should be above a crest  of  roof not  less than 1.5  m. Chimney’s utility (permeability)  
should be checked and  confirmed  by authorized chimney-sweeper at least once a 
year. 

 

PRIOR TO BOILER COMMISSIONING THE CHIMNEY SHOULD BE BASKED! 
 
It  is  recommended  that  the  flue  is  made  of  stainless  steel  material.  
If  
boiler  is  kept  with  low temperatures for longer time, such a flue is mandatory. 
Low temperatures in the boiler cause wet gases emission.   This may be found as the 
reason of  wetting and corroding of brick chimneys. 

 
 
 

Содержание UWG

Страница 1: ...CUMENTATION of water boiler s for heating installations SAS UWG type adopted for black coal combustion of nut coal SAS UWG Z A K A D M E T A L O W O K O T L A R S K I 28 100 Busko Zdr j Owczary ul Prz...

Страница 2: ...r to a chimney 7 6 4 Connecting boiler to a chimney installation 8 7 Operation and installation guidelines 8 7 1 Filing with water 8 7 2 Boiler s firing up 9 Table technical exploitation parameters 10...

Страница 3: ...3...

Страница 4: ...ection Boilers are specifically recommended for the flats heating in single family homes pavilions etc where calculated feeding water temperature does not exceed 85 C and working pressure does not exc...

Страница 5: ...or boilers SAS UWG above 17 kW for boilers up to 14 kW the washout door and load door make up one unit pos 5 6 for boiler s convection channels cleaning In the upper convection section of the boiler t...

Страница 6: ...ical Start Up Documentation 6 1 REQUIREMENTS FOR BOILER ROOM The boiler room where the heating boiler for central heating installation shall be installed must conform the requirements of detailed regu...

Страница 7: ...ed chimney draught of min 0 12 0 30 mbar see tab p 10 point 9 Selection of the chimney s height and section comparing to boiler power should be based on detailed regulations being in force in the coun...

Страница 8: ...ion NOTE It is recommended to connect the boiler to heating system provided with three or four pass valve The main advantage of such connection is boiler protection function against low temperature co...

Страница 9: ...and wood Then thin layer of coal is applied Once the batch of coal is glowing ash box and furnace door should be closed Open fuel load door and fill the combustion chamber with fuel up to the lower ed...

Страница 10: ...5 205 220 260 300 330 9 Required chimney draught mbar 0 30 10 Maximal allowable opperating pressure bar 1 5 11 Maximal allowable working temp C 85 12 Reccomended heating water working temp C 60 80 13...

Страница 11: ...blowdown connection 3 water jacket 10 air intake dosage flap 16 hot water connector pipe 22 thermometer 4 furnace chamber 11 water grates 17 smoke conduit 5 6 washout fuel load door 12 cast iron grate...

Страница 12: ...wdown connection 3 water jacket 10 air intake dosage flap 16 hot water connector pipe 22 thermometer 4 furnace chamber 11 water grates 17 smoke conduit 5 washout door 12 cast iron grates movable 18 sm...

Страница 13: ...ior each boiler s fire up process but not less than after 150 260 of boiler s continuous work Cleaning of convection channels with volatile ashes residues should be performed every 3 7 days depending...

Страница 14: ...its damage all defects of boiler should be immediately removed NOTE The boiler should be regularly cleansed from soot and tarry residues any residue on the convection channels walls disrupts proper h...

Страница 15: ...lements Clean both fumes whirlin elements and fumes channel with boiler s tools Sudden temperature and pressure rise installation valves closed open the valves pressure vessel frozen heat the pressure...

Страница 16: ...ating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boilers need to be transported in the vertical position In order to re...

Страница 17: ...ometer 5 Warranty does not cover consumable items sealant rope 6 Manufacturer is obligated to carry out the charge free repair under warranty in time period of 14 days starting from the date of applic...

Страница 18: ...mentation however basic described properties of the product shall be maintained Any remarks and questions on boiler s SAS type exploitation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Prze...

Страница 19: ...19 SERVICE REPAIRS...

Страница 20: ...mperature boiler of SAS UWG type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Отзывы: