
Commissioning
PR5230 Instrument Manual
EN-128
Sartorius
1. Determining an action
Determine the action for the rising edge of the reference signal under [Limit 1 on] from the following list
(here: Marker 1 is set when 900 kg are exceeded).
Accordingly, an action for [Limit 1 off] can be determined.
Setup/
Limit parameter
Limit 1 on
900 kg
Action
set marker 1
X64=1
Condition
no
condition
-----
Function
SPM Bit
-no action-
-----
No function
set marker 1
X64=1
Set marker 1
set marker 2
X65=1
Set marker 2
set marker 3
X66=1
Set marker 3
clr marker 1
X64=0
Clear marker 1
clr marker 2
X65=0
Clear marker 2
clr marker 3
X66=0
Clear marker 3
2. Determining a condition
Additionally, a condition [Condition] can be assigned to the signal; see Chapter 5.7.2.2.
5.7.4
Display of Limits and Digital Inputs/Outputs
5.7.4.1
VNC Display
Info/
HW-Slots
Builtin
Digital i/o
In use by PLC task
2
Digital outputs
001
The status is indicated from right to left.
Digital inputs
000
5.7.4.2
Instrument Display
The status is indicated from left to right.
Содержание PR5230
Страница 22: ...Transmitter in Field Housing PR5230 Instrument Manual EN 22 Sartorius 2 4 Overview of Connections ...
Страница 190: ......
Страница 207: ......