7. Test Pin
W-2WAY ECO-i SYSTEM
Trouble Diagnosis
When the test pin on the outdoor unit control PCB is short-circuited, each part can be operated individually.
•
After turning OFF the main unit power, short circuit the test pin (CN022, white), then turn the power back ON.
Output is performed in the sequence shown in the table below, for 0.5 seconds each.
Output
Operation
Output
Operation
1
Relay RY024
Supercooling valve 1 (SCV1)
11
Relay RY012
Save valve (SAVE)
2
Relay RY025
Supercooling valve 2 (SCV2)
12
Relay RY023
Pressure balance valve 2 (PBV2)
3
Relay RY021
Discharge valve 2 (DCV2)
13
Relay RY003
Crank case 2 (CH2)
4
Relay RY020
Discharge valve 1 (DCV1)
14
Relay RY002
Crank case 1 (CH1)
5
Relay RY005
Bypass valve (BPV)
15
Relay RY019
Supercooling valve 3 (SCV3)
6
Relay RY007
Recovery valve (ORVR)
16
Relay RY026
Discharge valve 3 (DCV3)
7
Relay RY006
Balance valve (BALV)
17
Relay RY027
Pressure balance valve 3 (PBV3)
8
Relay RY022
Pressure balance valve 1 (PBV1)
18
Relay RY004
Crank case 3 (CH3)
9
Relay RY017
Refrigerant balance valve (RBV)
10
Relay RY016
Refrigerant adjustment valve (RCV)