
Maintenance
Safety, Operation and Maintenance Manual - Aug 2012
5-91
SY115C9/135C/155H Crawler Hydraulic Excavator
A
B
C
CZ335-1104097
4. Turn the start switch to ON position (B).
Fig. 5-103
5. Place the lockout control to FREE position
(F). Operate the control lever to lower the
work equipment. Check the work equip-
ment whether it reaches the ground.
F
L
CZ335-1104098
Fig. 5-104
6. A work equipment lowering and touching
the ground under gravity indicates that the
accumulator functions normally.
In case that the work equipment is unable
to lower or is held half way, the pressure in
the hydraulic circuit accumulator may have
dropped already.
Consult Sany distributor for such inspec-
tion.
7. After checking through the a.m. steps,
place the hydraulic lockout control to LOCK
position and turn the start switch to OFF
position.
CZ335-1104099
Fig. 5-105
Содержание SY115C9
Страница 109: ...System Functions Safety Operation and Maintenance Manual Aug 2012 3 4 SY115C9 135C 155H Crawler Hydraulic Excavator ...
Страница 193: ...Operation Safety Operation and Maintenance Manual Sep 2012 4 4 SY115C9 135C 155H Crawler Hydraulic Excavator ...
Страница 263: ...Maintenance Safety Operation and Maintenance Manual Aug 2012 5 4 SY115C9 135C 155H Crawler Hydraulic Excavator ...
Страница 403: ...Specifications SY115C9 135C 155H Crawler Hydraulic Excavator 7 2 Safety Operation and Maintenance Manual Aug 2012 ...