
System Functions
Safety, Operation and Maintenance Manual - Aug 2012
3-21
SY115C9/135C/155H Crawler Hydraulic Excavator
Every 1000 service hours
Screen output
1. Maintenance interval.
2. Maintenance items.
3. Press [F1] to call
“
System Setup
”
. Enter
the pass code and confirm that mainte-
nance is done.
4. Press [F4] to start/pause rolling mainte-
nance:
→
→
……
5. Press [F5] to return to the
“
Main Page
”
.
Keypad input
[F1]: Maintenance is OK.
[F4]: Start/Pause rolling maintenance informa-
tion.
[F5]: Return to the "Main Page".
[ESC]: Return to the "Main Page".
[Enter]: Maintenance is OK.
Fig. 3-20
XP1351106015
1
2
3
4
5
Every 1000 Service Hours
①
Perform maintenance for every 500
service hours.
②
Grease the swing system.
③
Replace the screen of air conditioner.
Maintenance Information
Содержание SY115C9
Страница 109: ...System Functions Safety Operation and Maintenance Manual Aug 2012 3 4 SY115C9 135C 155H Crawler Hydraulic Excavator ...
Страница 193: ...Operation Safety Operation and Maintenance Manual Sep 2012 4 4 SY115C9 135C 155H Crawler Hydraulic Excavator ...
Страница 263: ...Maintenance Safety Operation and Maintenance Manual Aug 2012 5 4 SY115C9 135C 155H Crawler Hydraulic Excavator ...
Страница 403: ...Specifications SY115C9 135C 155H Crawler Hydraulic Excavator 7 2 Safety Operation and Maintenance Manual Aug 2012 ...