Ubigate iBG3026 Installation Manual/Ed.01
© SAMSUNG Electronics Co., Ltd.
15
General Site Requirements
Site Preparation
Before installing an iBG3026 router, ensure that the site conditions comply
with the following requirements and that the mounting equipment, tools, and
cables are available at the designated site.
For safety, Ubigate iBG3026 is intended to be installed in restricted access
location by service person.
See Required Tools and Materials for information about tools and materials
required for installation.
Environment
Site location is important for the proper operation of iBG3026 router.
Place the unit in a clean, dry environment with adequate air circulation.
Allow two to three feet additional clearance around the router for access to the
cable connectors on the front and rear panels.
All iBG3026 routers meet Networking Equipment Building Structure (NEBS)
environmental requirements. The selected installation site must meet basic
environmental requirements.
The following figure shows a top view of the path of cooling air through the
chassis. Clearance must be maintained near the air intake and exhaust vents to
prevent over-temperature conditions, which could result in router failure or
performance degradation.
Figure 2.1 Air flow of the iBG3026
Содержание Ubigate iBG3026
Страница 1: ......
Страница 14: ...INTRODUCTION XII SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 18: ...SAFETY CONCERNS XVI SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 26: ...TABLE OF CONTENTS XXIV SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 36: ...CHAPTER 1 iBG3026 Overview 10 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 114: ...CHAPTER 5 Components Installation 88 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 130: ...ANNEX B Cable Specifications 104 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 132: ...EQNA 000026 Ed 01 ...