Table of
Figures
Table of Figures
[Figure 2-1: Connection Diagram] ................................................................................................................ 5
[Figure 2-2: Part View of Samsung All in One] .......................................................................................... 7
[Figure 3-1: Process for the enclosure package removal]................................................................... 10
[Figure 3-2: Process for the battery package removal] ....................................................................... 10
[Figure 3-3: Packing List] ............................................................................................................................... 11
[Figure 3-4: Process for the battery assembly] ....................................................................................... 12
[Figure 3-5: Name Plate] ............................................................................................................................... 13
[Figure 4-1: Dimension of All in One] ........................................................................................................ 15
[Figure 4-2: Minimum Clearance for All in One] .................................................................................... 16
[Figure 4-3: Restriction for the surface gradient] .................................................................................. 16
[Figure 4-4: Spanner for fastening anchor nuts] ................................................................................... 17
[Figure 4-5: Anchor Bolt] ............................................................................................................................... 17
[Figure 4-6: A Flat head driver for the front cover knob (larger than 10mm)] ............................. 18
[Figure 4-7: The Plus head driver (No.2) for the tray, the side cover, and grounding] .............. 18
[Figure 4-8: A spanner for fastening use] ................................................................................................ 18
[Figure 4-9: A fork lifter with height of 85-200mm] ............................................................................. 19
[Figure 5-1: Electrical connections] ........................................................................................................... 21
[Figure 5-2: PV connections] ........................................................................................................................ 22
[Figure 5-3: Front Inside View] .................................................................................................................... 24
[Figure 5-4: Rear Inside View] ...................................................................................................................... 24
[Figure 5-5: Side View] ................................................................................................................................... 25
[Figure 5-6: Rear Inside View] ...................................................................................................................... 28
[Figure 5-7: Battery Tray Rear View] .......................................................................................................... 28
[Figure 5-8: Battery Connection] ................................................................................................................ 28
[Figure 5-9: Battery Docking description] ............................................................................................... 29
[Figure 5-10: Battery to BMS Connection] ............................................................................................... 30
[Figure 5-11: Cable Stuff Method].............................................................................................................. 30
[Figure 5-12: Battery Power Connection] ................................................................................................ 31
[Figure 5-13: Front Cover Assembly process 1] ..................................................................................... 32
[Figure 5-14: Front Cover Assembly process 2] ..................................................................................... 33
[Figure 5-15: Front Cover Assembly process 3] ..................................................................................... 33
[Figure 5-16: Front Cover Assembly process 4] ..................................................................................... 34
[Figure 5-17: Distribution box connection diagram] ........................................................................... 35
[Figure 5-18: Electric cable connection for energy meter installation] .......................................... 37
[Figure 5-19: PV connector (Female) and PV line (Male)] ................................................................... 38
[Figure 5-20: Side cover opening] .............................................................................................................. 38
[Figure 5-21: PV connector connection (MC4 connector connection)] ......................................... 39
[Figure 5-22: L and N AC line connection method] .............................................................................. 39
[Figure 5-23: Terminal Block] ....................................................................................................................... 40
[Figure 5-24: Power Cable connection to the terminal block] .......................................................... 40
[Figure 5-25: Side view after side cover assembly] ............................................................................... 41
[Figure 6-1: Internet Connection] .............................................................................................................. 42
[Figure 6-2: Bi-directional D0 Meter Connection] ................................................................................. 43
[Figure 6-3: Bi-directional RS485 Meter Connection (For EM24)] .................................................... 44
[Figure 6-4: RS485 terminal block] ............................................................................................................. 44
[Figure 6-5: Communication terminal] ..................................................................................................... 45
[Figure 6-6: Log-in page] .............................................................................................................................. 46
[Figure 6-7: Password initialization page] ............................................................................................... 47
[Figure 6-8: Monitoring page] ..................................................................................................................... 48
Australia (Eng.) 05/2015. Rev1.1
v
Содержание ELSR362-00004
Страница 13: ...2 Safety Figure 2 1 Connection Diagram Australia Eng 05 2015 Rev1 1 5 ...
Страница 27: ...4 Installation Figure 4 9 A fork lifter with height of 85 200mm Australia Eng 05 2015 Rev1 1 19 ...
Страница 30: ...5 Electrical Connections Figure 5 2 PV connections 22 Australia Eng 05 2015 Rev1 1 ...
Страница 49: ...5 Electrical Connections Figure 5 25 Side view after side cover assembly Australia Eng 05 2015 Rev1 1 41 ...
Страница 103: ...Australia Eng 05 2015 Rev1 1 ...