9. Problem Confirmation
Type
Code
Description
Measures
If it is not removed until the time limit is
reached, it is converted to a significant
event.
PROTECTION E0205 NORMAL GRID
OFF
While in progress, battery
discharged/charged operation is terminated
through the protection function.
Wait until the event message disappears.
After the event message is removed, it
automatically returns to normal.
If it is not removed until the time limit is
reached, it is converted to a significant
event.
PROTECTION E206
NORMAL BATT
STATUS EVENT
While in progress, battery
discharged/charged operation is terminated
through the protection function.
Wait until the event message disappears.
After the event message is removed, it
automatically returns to normal.
If it is not removed until the time limit is
reached, it is converted to a significant
event.
PROTECTION E207
NORMAL INV DC
LINK EVENT
While in progress, battery
discharged/charged operation is terminated
through the protection function.
Wait until the event message disappears.
After the event message is removed, it
automatically returns to normal.
If it is not removed until the time limit is
reached, it is converted to a significant
event.
PROTECTION E208
NORMAL BATT V
& BATT I & BDC
DC LINK EVENT
While in progress, battery
discharged/charged operation is terminated
through the protection function.
Wait until the event message disappears.
After the event message is removed, it
automatically returns to normal.
If it is not removed until the time limit is
reached, it is converted to a significant
event.
[Table 9-3: Battery operation general events list
9.1.4
PV General Events (Protection)
Type
Code
Description
Measures
PROTECTION E301
ON SEQUENCE
GRID OFF
PV generation mode is stopped by the
protection event.
Wait until the event message disappears.
Australia (Eng.) 05/2015. Rev1.1
73
Содержание ELSR362-00004
Страница 13: ...2 Safety Figure 2 1 Connection Diagram Australia Eng 05 2015 Rev1 1 5 ...
Страница 27: ...4 Installation Figure 4 9 A fork lifter with height of 85 200mm Australia Eng 05 2015 Rev1 1 19 ...
Страница 30: ...5 Electrical Connections Figure 5 2 PV connections 22 Australia Eng 05 2015 Rev1 1 ...
Страница 49: ...5 Electrical Connections Figure 5 25 Side view after side cover assembly Australia Eng 05 2015 Rev1 1 41 ...
Страница 103: ...Australia Eng 05 2015 Rev1 1 ...