7. Entering Initial Installation Information
7.3.5
Entering Setting Value
7.3.5.1
S/N
Enter shipment value from the factory (a subsequent modification is not available.)
7.3.5.2
Region
Select a city and enter the city name for installation on the menu.
7.3.5.3
PV Install Value
Enter installation capacity of each PV string.
Enter by typing by hand.
7.3.5.4
Sever IP & Port
Enter as basic value.
Perform any modification for relevant issues only.
7.3.5.5
Energy Meter Selection
Meter Type
D0 (Bi-Direction)
RS485
D0 Meter model selection
Input when Meter Type is D0
D0-bi/feed-In: Choose and input for inter-direction meter connection, or choose one-
direction, feed-in type
D0-Purchase: choose one-direction purchase type
If Meter Type is set to D0 (Bi-Direction), only configure
D0-Bi
/
Feed-In
.
7.3.5.6
Date/Time setting
Enter the current date and time
7.3.5.7
Save and Restart
Save onto the system after all the procedures above are completed.
7.3.5.8
Grid Feed in Limit Regulation Setting
For some countries that have a regulation for the grid feed in limit, the device allows the
installer to set up a limit value. You can select the required limit value in the [Feed in Limit
Percentage] on the set up screen. The selectable values is 0%, 60%, 70%, 80%, 90%, and
unLimited. The term
unlimited
means that is that there is no grid feed-in limit.
54
Australia (Eng.) 05/2015. Rev1.1
Содержание ELSR362-00004
Страница 13: ...2 Safety Figure 2 1 Connection Diagram Australia Eng 05 2015 Rev1 1 5 ...
Страница 27: ...4 Installation Figure 4 9 A fork lifter with height of 85 200mm Australia Eng 05 2015 Rev1 1 19 ...
Страница 30: ...5 Electrical Connections Figure 5 2 PV connections 22 Australia Eng 05 2015 Rev1 1 ...
Страница 49: ...5 Electrical Connections Figure 5 25 Side view after side cover assembly Australia Eng 05 2015 Rev1 1 41 ...
Страница 103: ...Australia Eng 05 2015 Rev1 1 ...