4-18
Samsung Electronics
4-3 Appropriate Measures for Different Symptom
4-3-1 Outdoor Unit Test Operation Flow
If the Auto Trial Operation is not completed - UP is displyed(UnPrepared)
Prior to starting the air conditioning operation after the ini-
tial installation and Auto Trial Operation is carried out.
This process, the stable operation to protect the system and verify the
defect of the product.
1. Tracking is complete and after the initial installation, if you do not
have a history of Auto Trial Operation is completed, UP will be dis-
played.
2. Execute the Auto Trial Operation by Tact Switch.
3. UP display disappears after Auto Trial Operation is complete, normal
operation is possible.
4. Auto Trial Operation is completed, if there is a history, normal opera-
tion execution.
No
Yes
Was Auto Trial Operation
Completed?
Power On
Trial Operation available
LED display the UP (UnPrepared)
Preilminary check for the Test Operation
Execute the Auto Trial Operation
Содержание DVM S AM080FXVAGH
Страница 15: ...Samsung Electronics 2 9 2 1 3 Structure of product Heat Pump AM6666XV66H Series Small size Large size ...
Страница 199: ...Samsung Electronics 5 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 5 PCB Diagram and Parts List 5 1 ASS Y PCB MAIN ...
Страница 202: ...5 4 Samsung Electronics 5 2 ASS YPCBMAIN HUB ŶAC 1 2 3 4 5 6 7 8 9 10 11 12 ...
Страница 204: ...PCB Diagram and Parts List 5 6 Samsung Electronics ASS YPCBMAIN HUB cont ŶDC 1 1 2 3 4 5 6 7 8 9 10 11 ...
Страница 210: ...5 12 Samsung Electronics 5 4 ASS YPCBFAN Model 1 FANchassis 1 5 2 6 3 4 ...
Страница 212: ...5 14 Samsung Electronics ASS YPCBFAN cont Model 2 FAN chassis 1 7 2 8 3 4 5 9 6 ...
Страница 253: ...8 12 Samsung Electronics 8 3 How to check the view mode using a tact switch 㽞 AM080ί2606XV666 rX rY rZ r ...