4.1 Connecting the column
4 Installation/Maintenance
S122
User /
Service Instructions
28
4
Installation/Maintenance
4.1
Connecting the column
1.
Lift the weigh
plate off the platform and remove the
packing material.
2.
Thread the load cell cable A through the column.
3.
Fasten the column to the platform using the Allen key B
provided.
4.
Remove the knob C from the bracket D and slide the
hinge apart slightly so that the plug can be threaded
through the cent
er
of the bracket. Reassemble the
bracket.
A
B
C
D
E
Содержание S122
Страница 1: ...76104 180 Issue 0 76104 180 21 07 2004 ENGLISH S122 Light Industrial Scale User Service Instructions...
Страница 26: ...Creating a preset tare Example 1lb Reviewing a pre set tare value...
Страница 27: ...Canceling a pre set tare...
Страница 59: ...S122 User Service Instructions 6 2 Wiring Diagrams 6 2 Main board connections 6 2 Main board connections...
Страница 60: ...6 3 Load cell connections 6 3 Wiring Diagrams S122 User Service Instructions 6 3 Load cell connections...