29
S122
User /
Service Instructions
4 Installation/Maintenance
4.1 Connecting the column
5.
For
legal for trade scales
, make sure that the
grounding
connector E is attached to the lip of the column. If a
ferrite
bead
is used it should hang on wire between connector
A and bracket D.
6.
Fasten the bracket to the column. Make sure that the
clamp is at the back of the
scale
.
7.
For
legal for trade scales
in
US
territory the
scale
must
be sealed in the following manner.
Содержание S122
Страница 1: ...76104 180 Issue 0 76104 180 21 07 2004 ENGLISH S122 Light Industrial Scale User Service Instructions...
Страница 26: ...Creating a preset tare Example 1lb Reviewing a pre set tare value...
Страница 27: ...Canceling a pre set tare...
Страница 59: ...S122 User Service Instructions 6 2 Wiring Diagrams 6 2 Main board connections 6 2 Main board connections...
Страница 60: ...6 3 Load cell connections 6 3 Wiring Diagrams S122 User Service Instructions 6 3 Load cell connections...