Troubleshhooting
Connecting the monitor to check the operation of the air conditioner system.
Process
1. Connect the cable of the RS-485 converter to the P5 position master board.
2. Connect the cable of the RS-485 converter to the computer.
3. Open the monitor program
Saijo denki International co.,ltd.
97
Signal converter RS 485
Master Board
Содержание CVIA-80-CPF3
Страница 3: ...Saijo denki International co ltd 2 ...
Страница 37: ...Models SDV 13M A VTGP1 SDV 60M A VTGP1 Saijo denki International co ltd 35 Wiring Diagrams Indoor unit ...
Страница 41: ......
Страница 46: ......
Страница 47: ......
Страница 49: ...Z Service valve Check joint Temperature Saijo denki International co ltd 41 Symbol ...