page for list of Rytec terms for the parts of the door.

How to uncrate the door and 

inspect the installation site

Spirals ship in two crates (three if 

there is a slanted hood cover). 

Each set of crates is marked with the 

unique serial number for the door 

a

 and the number of 

crates used for the door 

b

All parts for the door are in these crates.

 

If more than one door is to be installed, 

 

treat each set of crates as a separate installation.

 

Mixing parts from different doors voids the warranty for 

all doors in the installation.

Remove

 all top panels.

 

Hartford, CT

Front

1/3

91893-10

2/3

3/3

91893-10

91893-10

Hartford, CT

a

b

Panels 

are made of 

fiberboard that shreds 

easily, and are secured 

with many nails. 

Slide the pry bar

 along the edge, 

prying gently every six inches, to 

remove the panel in one piece. 

Pry bar

 

Check the crates.

 Make sure

 all serial numbers match the number on the crate and all visible parts have no shipping damage. 

Check your tools. 

Make sure

 you have all tools and supplies for the installation. 

91893-10

91893-10

Head assembly: 

check the 

serial number on the label 

(inside top, non-drive side).

Flat top hood cover 

(optional): 

preinstalled. 

Must be removed to 

access the head 

assembly components, 

then reinstalled.

Front hood cover 

(optional): 

preinstalled. 

Some panels must 

be removed, then 

reinstalled.

Small parts box(es):

 check the serial 

number on side of box. 

There may be two boxes.

Open box

, remove the red 

documents envelope, then 

open the envelope and get the 

object list (also called the cut sheet). 

Check serial numbers on both.

Parts and hardware

 that you find in the box(es) 

will be called out in this manual as they are needed.

Slanted top hood 

cover (optional): 

third crate holds 

panels and 

brackets. Number 

varies based on 

size of door.

Drive belt guard cover:

indicates drive side. 

May be left (LH) or right (RH). 

LH is used for this manual.

Springs:

 number

varies from one 

to twelve based 

on size of door. 

Bottom hood cover

(optional): 

panels are crated 

in front of head assembly, 

and brackets are crated 

under the lifting cradle.

Side columns:

 

check the serial 

number on the label.

Serial Number

D0091813-010

Please refer to the above serial number for technical support,

parts and service assistance

Toll Free Technical Support

1–800–628–1909

One Center Parkway   

Jackson, Wisconsin  53037 – 0403 

      United States

888 – 80 – RYTEC 

 

Phone 262 – 677 – 9048 

 

Fax 262 – 677 – 2058 

Serial Number

D0091813-010

Please refer to the above serial number for technical support,

parts and service assistance

Toll Free Technical Support

1–800–628–1909

One Center Parkway   

Jackson, Wisconsin  53037 – 0403 

      United States

888 – 80 – RYTEC 

 

Phone 262 – 677 – 9048 

 

Fax 262 – 677 – 2058 

Serial number

 D0091893-010

Configuration

DOOR MODEL NAME

Spiral Full Vision "L"

Door Width (Inches)

144.094

Door Height (Inches)

128.346

Production Width in mm

3,660

Production Height in mm

3,260

Door head sizeB

Line Voltage 460V

motor mount side Righ

t Hand Motor

Motor Duty

Standard Duty Motor

Horsepower

2.0

Number of solid slats

0

Number of vent slats

0

Brake Release Location

Release lever on side c

olumn

Hood style

No spiral hood type

Number of Springs 4

Spring Tension (in)

4.724

LH Inner Spring Pack Qt

y

0

LH Outer Spring Pack Qt

y

2

RH Outer Spring Pack Qt

y

2

RH Inner Spring Pack Qt

y

0

Spring Tension in mm

120

Number of pre-wraps

2.250

Information on routing

SPIRAL STT-L

Seq.  0

Sequence type

Ref.seq.

From operation

To operation

Std.seq.

Operation 0010

 Seq. 0

Work center

Plnt

Description

Start

Fin.

Confirmation no.

P2_SMPRT

2000

ASSEMBLE SMALL PARTS

06/03/2019 06/03/2019 0001632113

Components

 for Op. 0010

 Seq. 0

Item no.

Material

Qty

Date

0020 H1071779-0A01

ASSY,BKT,STRAP,SPRINGM

OUNT,SHORT

1 EA

06/03/2019

0020 H1071779-0A01

ASSY,BKT,STRAP,SPRINGM

OUNT,SHORT

1 EA

06/03/2019

0030 R217605

GUIDE TUBE, SPRING PACK

HARD PVC

2 EA

06/03/2019

0030 R217605

GUIDE TUBE, SPRING PACK

HARD PVC

2 EA

06/03/2019

0040 R217902Z4

GUIDE BRKT ASSY,OUTER,2

SPRING

1 EA

06/03/2019

0040 R217902Z4

GUIDE BRKT ASSY,OUTER,2

SPRING

1 EA

06/03/2019

0070 R1070963-1Z04

ASSY, UPPER CORNER BRAC

KET, LH

1 EA

06/03/2019

0080 R1070963-2Z04

ASSY, UPPER CORNER BRAC

KET, RH

1 EA

06/03/2019

0090 H1071027-0Z04

WIRELESS BRACKET ARM

WITH WARNING TAG

1 EA

06/03/2019

0120 R00152000

MANUAL, SYSTEM 4 DRIVE

& CONTROLS

1 EA

06/03/2019

0130 R1071645-0

MANUAL, OWNERS, SPIRAL

1 EA

06/03/2019

0140 R1071644-0

MANUAL, INSTALL, SPIRAL

1 EA

06/03/2019

0150 R08151080

CLAMP,CABLE STOP

1 EA

06/03/2019

0160 R01900820

BSCSF,M8-1.25 X 20,T40,ZN

6 EA

06/03/2019

0170 R01900812

BSCSF,M8-1.25 X 12,T40,Z

N

4 EA

06/03/2019

0180 R5550259-0Z01

HFSMS,M6-1.0x20mm,ZN

4 EA

06/03/2019

0190 R1210590-0

AEROSOL CAN 12 OZPAINT

, RYTEC SILVER

1 EA

06/03/2019

User: CHRISF

Date: 06/06/2019 15:07

 Page: 001/002

Order type

ZP02

RYTEC MTO Order

Order number

20000597

MRP controller

500

B5 ZMAT

Creation Date

05/31/2019

Production scheduler

T7

Tier 7

Order quantity

1 EA

Finish

06/05/2019

Start

06/03/2019

Material number

724

Material description

SPIRAL STT-L

Reservation number

0002425475

Status

REL MSPT PRT PRC SETC

Object list

Original

Plant

2000

Rytec Corporation -

IMPOR

TANT DO

CUMENTS ENCLO

SED

CONTENTS:

OWNER'W MANUAL

INS

TALLA

TIO

N M

ANUAL

DO

OR CO

NTROLLER MANUAL

WARRANTY INFO

RMA

TION

OJBEC

T LIST(S)

PRODUC

T DRA

WINGS(S)

SER

VICE BULLETINS(S)

OTHER

DOO

R SERIAL # 

SPIRAL

D0091893-10

SMALL PARTS

SmartSurroundᵀᴹ 

light curtains:

 

packed in tube

Hardware

tools and

sizes

(manual or

powered)

You

also

provide

Cable ties

and anchors

Anchoring

tools

Laser level

Spirit level

Carpenter’s

square

(2) Sockets or

wrenches needed

Phillips

screwdriver

Flat

screwdriver

Precision

screwdriver

Pry bar and mallet

or reciprocating saw 

Crowbar

Cutting

pliers

Utility

kinfe

(2) Bar

clamps

Measuring

tape

Socket or

open wrench

Torx

screwdriver

T20

T30

T40

Tools

you 

need

7mm

10mm

13mm

#2

Anchoring

hardware

Shims

Caulk

5/16"

10mm

13mm

17mm

Содержание Spiral SST

Страница 1: ... personnel and equipment to safely perform all lifts Make sure you have been informed of any hazardous conditions that exist within the installation site Make sure the installation site is kept clear of obstructions and debris and that the floor is dry Make sure you are aware of the location of all power lines piping and HVAC systems within the installation site Make sure all accessories installed...

Страница 2: ...user terminal Primary drive pulley Drive shaft Wire chase Secondary drive pulley Primary drive belt Secondary drive belt Spring straps Spring clamp and bracket CAN bus repeater box Motor Brake release Encoder inside motor Wireless antenna and antenna arm Corner bracket Inside the drive side console Table of Contents Rytec installation safety information 1 Requirements Staffing 1 Electrician s resp...

Страница 3: ...embly 201 L SAI Slot2 CAN signal path CAN signal path NEW in 2022 Spirals Smartsurround light curtains and CAN bus cabling Two new features have been added to Spirals in 2022 both of which change the installation process CAN bus cabling The CAN bus system simplifies cabling and minimizes internal field wiring during installation the system works this way CAN bus cabling is a single chain series of...

Страница 4: ... number D0091893 01 0 Configuration DOOR MODEL NAME Spiral Full Vision L Door Width Inches 144 094 Door Height Inches 128 346 Production Width in mm 3 660 Production Height in mm 3 260 Door head sizeB Line Voltage 460V motor mount side Right Hand Motor Motor Duty Standard Duty Motor Horsepower 2 0 Number of solid slats 0 Number of vent slats 0 Brake Release Location Release lever on side column Ho...

Страница 5: ...d height match the numbers on the object list 3 Calculate the width to center divide the Door Width a by 2 Write this number on the object list Use it when you center the door 4 Find the total width of the door measure the width of the head assembly c in the crate Write this number on the object list 5 Calculate the total height of the door Start with the Door Height b Measure the height of the he...

Страница 6: ...ver If the door has a preinstalled flat top hood cover a remove this end panels first If the door has a preinstalled front hood cover b remove this end panels next The end spacer bracket c is removed with the console cover Do this on both sides of the head assembly 2 L and L R doors remove the side console covers NOTE this is called the belt guard cover on the drive side Do this on both sides of t...

Страница 7: ...ed nuts Front screws connect to riveted nuts STT S Full vision doors have a spacer at the rear of the head assembly Line up bracket with spacer Solid panel doors have no spacer SST S R If the door has a slanted top hood cover do not reinstall the outer screws and washers until the cover is installed 13mm Cutting pliers Protect your cables Make sure all cables preinstalled in the head assembly are ...

Страница 8: ...cables labeled 01 Make sure the cables are disconnected when you remove the cover You will reconnect them later KEEP REUSE number of screws varies based on height of door number of screws varies based on height of door T40 Remove tags from cables 3 Make sure the vertical guide tracks for the door panels are in the fully lowered position 4 Loosen the holders on the vertical guide track If necessary...

Страница 9: ...r 0002425475 Status REL MSPT PRT PRC SETC Object list Original Plant 2000 Rytec Corporation Door Width Inches 144 094 Door Height Inches 128 346 Reference line Centerline w w 1 2 a 90º Width to center 1 2 a 144 1 16 123 3 8 Plumb level square how to position the door correctly as you install the side columns Call Rytec technical support at 800 628 1909 immediately and stop the installation if you ...

Страница 10: ...h sides of door opening 26 26 26 If measurements are the same the floor is level 27 If measurements are not the same shim the side with the larger number Use the difference for the height of the shim Measurements should match when you measure with the shims in place 3 If the floor is level install the drive side column first If the floor is not level install the side column that is not shimmed fir...

Страница 11: ...r on side column Hood style No spiral hood type Number of Springs 4 Spring Tension in 4 724 LH Inner Spring Pack Qty 0 LH Outer Spring Pack Qty 2 RH Outer Spring Pack Qty 2 0 Order type ZP02 RYTEC MTO Order Order number 20000597 MRP controller 500 B5 ZMAT Creation Date 05 31 2019 Production scheduler T7 Tier 7 Order quantity 1 EA Finish 06 05 2019 Start 06 03 2019 Material number 724 Material desc...

Страница 12: ... seal 1 Install bolts on both sides of the seal and hand tighten 2 Make sure the back of the seal is flush with the back of the side column and that there is direct contact with the wall If necessary shim the seal where it meets both side columns and at the anchor point so that both conditions are met 3 Make sure the rear seal is level Anchor rear seal to wall at all anchor points 4 10mm Tighten t...

Страница 13: ...ure the distances are the same Measure distance from bottom corner of drive side to top corner of non drive side then from bottom corner of non drive side to top corner of drive side b Make sure the distances are the same 3 Tighten all anchors Laser level Use the screws on the track holders as your reference Measuring tape a a b b Anchoring hardware How to install the head assembly 1 Line up the h...

Страница 14: ... and nut are not installed Use at least one anchor on each side of the bracket Rear screw connects to flanged nut Front screw connects to riveted nut 2 2 KEEP REUSE T40 b a How to raise the vertical guide tracks into place 1 Make sure that all of the vertical guide track holders are loose enough to allow the track to move freely DO NOT remove any of the holders 2 Make sure the pins at the top of t...

Страница 15: ...ction scheduler T7 Tier 7 Order quantity 1 EA Finish 06 05 2019 Start 06 03 2019 Material number 724 Material description SPIRAL STT L Reservation number 0002425475 Status REL MSPT PRT PRC SETC Object list Original Plant 2000 Rytec Corporation DOOR MODEL NAME Spiral Full Vision L Door Width Inches 144 094 Door Height Inches 128 346 Production Width in mm 3 660 Production Height in mm 3 260 Door he...

Страница 16: ...the cable tie on the outer spring strap and let it drop 8 Loosen the clamp on the spring strap 9 Position the spring bracket so that the bumpers and locking tab face the side wall 10 Loop the spring strap around the bolt in the spring bracket Thread the strap between two plates of the clamp Hand tighten the clamp nuts DO NOT trim the strap 11 Set the spring tension This is the distance the springs...

Страница 17: ... retaining slot c How to install a second assembly in the side column 1 Install the guide tubes into the second bracket Install the second bracket above the first bracket 2 Follow steps 4 15 for installing the springs Make sure the spring bracket bumpers face out toward the first spring assembly 13mm 2 c a b 01260110 01901506 2 SMALL PARTS 10mm How to install the locking collars at the top and bot...

Страница 18: ...d to keep the belt tight Cut the two cable ties to release the belt 4 Remove the top nut on the front baseplate mounting post Keep the nut Loosen the top nut on the rear mounting post DO NOT loosen the bottom nuts b a d c Cutting pliers KEEP REUSE 17mm 5 Set the height of the top nut on the rear baseplate mounting post a 1 Slide the rear flange of the baseplate pulley assembly b under the top nut ...

Страница 19: ...ttom hood spreader in the small parts box Locate the bottom hood spreader SMALL PARTS 01900820 2 SMALL PARTS 01900820 2 Drive side Corner bracket Corner bracket Wireless antenna arm Non drive side SMALL PARTS 01901508 L and L R doors bottom hood spreader S and S R doors bottom hood spreader 01900820 L and L R doors 4 screws and nuts S and S R doors 8 screws and nuts Spreader brackets Spreader brac...

Страница 20: ...rive side console connect the M12 CAN connectors The male M12 for the cable from the CAN port in the side column to the female M12 connector for the cable that crosses the spreader Line up the embossed arrows on the connectors to align the guide notch and contacts correctly The connectors will only fully connect if they are aligned correctly 2 Find the schematics for the door in the red document e...

Страница 21: ...10877 2 5 16 Distance between wall mounted SmartSurround and door track should match distance between cover mounted SmartSurround and door track 2 Connect the two cables that connect the wall mounted SmartSurround light curtain to the CAN port Line up the embossed arrows on the connectors to align the guide notch and contacts correctly The connectors will only fully connect if they are aligned cor...

Страница 22: ...10765 0 BTA4 unit 1 b 1210766 0 BTA4 frame 1 c 5550351 0A01 Mounting hardware 5 5550057 0Z01 side column d 1210756 0 Mounting hardware 5 5550353 0 wall SMALL PARTS 1210800 2 5 Line up the two bottom tabs on the BTA4 unit with the bottom tabs in the frame a Then snap the two top tabs into place b 6 In the head assembly on the drive side remove the jumper from port 1 on the CAN repeater a and plug i...

Страница 23: ... down but it should not require excessive force to reach the fully released position If you feel too much resistance loosen the tension on the cable DO NOT trim the cable until the brake release has been fully tested Make sure the clamp is tight enough to hold when pressure is applied 1 Locate the brake release cable in the console Loosen the retaining nut and slide it down the length of the brake...

Страница 24: ... console A B C A B N GND A B C GND GND A B C WARNING WARNING The activation whip and activator box are used to wire optional additional activators for the door If the junction box is not needed tuck it back into the console The high voltage power whip and junction box are required to bring power to the door When the non drive side cover is reinstalled whips may be run through the rear of the cover...

Страница 25: ... 3 Install the spacer bracket from the small parts box onto the side console Do this on both sides of the head assembly SMALL PARTS 01900820 Number of screws varies based on height of door Number of screws varies based on height of door Spacer brackets Splice bracket L L R S S R Bottom hood cover panels T40 KEEP REUSE number of torx screws varies based on size of door number of torx screws varies ...

Страница 26: ...and L R doors install the end splice bracket Do this on both sides of the head assembly Splice bracket End splice bracket Flashing L L R S S R Top hood cover panels SMALL PARTS 2 01900820 T40 3 L and L R doors install the rest of the splice brackets 4 S and S R doors install the end splice bracket Do this on both sides of the head assembly 5 S and S R doors finish anchoring the wall mount bracket ...

Страница 27: ...overlaps the panel to the left T40 T40 SMALL PARTS 4 4 01901508 01900820 13mm 13mm T40 SMALL PARTS 01900820 4 8 Align side flashing with top of hood cover place flashing tight against the cover and anchor in place Do this on both sides of the head assembly 9 Align top flashing with end of side flashing place flashing tight against the cover and anchor in place The two sections of top flashing over...

Страница 28: ...right side of display press arrows to change paramter value Parameter name The Controller Display The Controller Controls Parameter number All three digits are hexadecimal Parameter value value being changed change saved RESET Button Press to toggle the flashing cursor between parameters and values Press and hold to save changes to a value UP Arrow Press to increase a value or parameter number Pre...

Страница 29: ...L SAI Slot2 PDN UI 000060 201 0948 9147 L SAI Slot2 until the setting is saved 401 L SAI Slot4 PDN UI 000052 1x to show the first set of light curtains 401 0932 9156 L SAI Slot4 Drive side Non drive side Do This Result 8 If the current selection does NOT light the LEDs Re check the light curtains 9 If the current selection DOES light the LEDs 10 The controller moves to parameter L 501 11 Do This R...

Страница 30: ...un mode The door may not open or close completely during automatic calibration This is normal When calibration is complete the door will open and close correctly You can manually adjust the close limit after calibration is complete by changing parameter P 275 See page 34 _0 Press Reset Syncron until the Syncron screen displays _0 Hold Reset To Open Pos RY FT 000091 1x to start sequence _0 Hold Res...

Страница 31: ...mity sensor 5 Is the door operating correctly Test listen for grinding whining or excessive motor noise Watch for changes in speed or excessive movement of the motor or drum Yes no action is needed No contact Rytec technical support at 800 628 1909 _0 Hold Reset To Open Pos RY FT 000092 fully open and close door five times Laser level Use the hinge screws as the vertical reference How to reverse t...

Страница 32: ... Laser level Always adjust the belt to lower the side of the door panel that is higher 17mm 13mm 3 In the head assembly jump the secondary drive belt one notch in the pulley Adjust the belt one tooth at a time then recheck level 4 Level the door panel again If the door panel is not level repeat these steps and retest If the door panel is level reset the tension on the belt 5 To reset the tension o...

Страница 33: ...elease lever DO NOT remove the cable The play in the spring allows it to turn with the release lever until it is free of the motor F211 E Stop Ext1 Emergency Stop Door is Stopped F211 E Stop Ext1 Emergency Stop Lever down brake released Lever up brake reset Controller No action is needed Reset the sensor 10mm 2 Remove the four screws and the bottom cover of the motor 3 Check the distance between t...

Страница 34: ...rd 5 The Service level password is saved 6 You can now go to parameter 275 Next navigate to parameter P 275 parameter P 221 for doors with photo eyes and change the value Do This Result 1 The default value is 12 default at 2 You can now change the value The UP arrow increases the value and raises the close limit position for the door The Down arrow decreases the value and lowers the close limit fo...

Страница 35: ... press either arrow to start cycling 5 Sec Acl 1 Receiver Transmitter a c b d If the red LED is on run a laser level on the vertical guide track to make sure the light curtains are at the same height Adjust if necessary Laser level 4 Test the Advanced3 light curtains by placing your hand flat across any of the light curtains at the top a middle b and bottom c while the door panel closes Make sure ...

Страница 36: ...s S S R doors T40 If the door has a preinstalled front hood cover reinstall the front spacer brackets in front of the console covers 3 Notes S and S R doors have both top and bottom front spreaders 4 If necessary use the spray paint to correct blemishes in the door finish 5 Caulk between the door opening and the door 6 Full vision SST doors remove the protective plastic film from both sides of eac...

Отзывы: