background image

RG-SS6510

-

4C Series Switch Hardware Installation and Reference Guide                                 

Product Overview 

- 7 - 

 

 

Solid blue 

Device location is enabled. 

MGMT port indicator 

MGMT 

Off 

The port is not connected. 

Green 

The port is connected at 1000Mbps. 

Yellow 

The port is connected at 10/100Mbps. 

Blinking 

The port is transmitting or receiving data. 

Power Supply 

The RG-S6510-4C series switch supports power supply the PA800I-F. The smart power supply module supports power 

management, and the host can read input power, input current, and temperature in real time. The power supply module 

supports hot swapping. 

 

The RG-S6510-4C series switch supports 1+1 power supply redundancy. To improve the stability and reliability of 

the  entire  system,  it  is  recommended  to  configure  1+1  power  supply  redundancy.  When  the  two  power  supply 

modules work normally, the switch is in the status of current sharing. 

 

It requires at least one power supply module to work normally. Install a blank panel to the empty slot to prevent 

dust from entering the switch. 

Heat Dissipation 

The working temperature of the RG-S6510-4C switch is 0°C to 40°C (32°F to 104°F), and the heat dissipation design 

needs to ensure the stability, safety and maintainability in such  environment. The RG-S6510-4C series switch adopts 

fan ventilation and forced convection to ensure the device can work normally in specified environment. Dust the device 

every three months to avoid blocking the ventilation openings. 

The  RG-S6510-4C  supports  M6500-FAN-F  and  provides  fan  speed  regulation,  fan  failure  warning,  and  fan  hot 

swapping. 

Figure 1-5 Ventilation and Heat Dissipation of the RG-S6510-4C   

 

 

Maintain a minimum of 20 cm clearance around the device for ventilation. 

 

It requires at least two fan modules to work normally. Install a blank panel to the empty slot to prevent dust from 

entering the switch. 

Содержание M6500-08CQ

Страница 1: ...Ruijie RG S6510 4C Series Switches Hardware Installation and Reference Guide...

Страница 2: ...or by any means without the prior written consent of Ruijie Networks is prohibited Exemption Statement This document is provided as is The contents of this document are subject to change without any n...

Страница 3: ...t before the switch can be installed Chapter 3 Product Installation describes how to install the integrated switch and modules and connect its power cables and grounding lines Chapter 4 System Debuggi...

Страница 4: ...ommand Reference Describes the related configuration commands including command modes parameter descriptions usage guides and related examples Symbol Conventions Means reader take note Notes contain h...

Страница 5: ...n SFP28 port supports 25G 10Gbase R and does not support 1000base X A QSFP28 port supports both 100G 40G mode and 4x25G 4x10G mode 1 1 RG S6510 4C Specifications Model RG S6510 4C CPU Quad core proces...

Страница 6: ...Humidity 10 to 90 RH non condensing Weight with 3 fan modules and 2 power modules 19 kg 41 89 lbs Dimensions L x W x H 442 mm x 520 mm x 86 mm 17 40 in x 20 47 in x 3 39 in 2RU RG S6510 4C switch is...

Страница 7: ...l Port 7 MGMT Status Indicator 8 ID Indicator 9 Status Indicator 10 Reserved Function Button 11 Asset Management Label 12 Grounding Point 13 Power Slot Asset Management Label The asset management labe...

Страница 8: ...ort of terminal PC to perform system debugging configuration maintenance management and host software uploading Mini USB serial port Use mini USB cable to connect the USB port This interface is connec...

Страница 9: ...ormally the switch is in the status of current sharing It requires at least one power supply module to work normally Install a blank panel to the empty slot to prevent dust from entering the switch He...

Страница 10: ...FP28 QSFP modules Both fiber modules and DAC can be used Indicator Indicator Panel Identification Status Meaning System indicator Status Off The system is not powered up Solid red The module fails or...

Страница 11: ...er Consumption 57W EMC GB9254 2008 CLASS A Safety specification GB4943 2011 Operating Temperature 0 C to 45 C 32 F to 113 F Storage Temperature 40 C to 70 C 40 F to 158 F Operating Humidity 10 to 90 R...

Страница 12: ...tting data at 25G 10G 1F 8F 1 100G 1 40G Off The port is down Solid green The port is connected at 100G 40G Blinking green The port is receiving or transmitting data at 100G 40G Specifications Module...

Страница 13: ...d The module fails or resets Blinking green The system is initializing Solid green The system is operational Solid yellow The temperature exceeds the threshold QSFP port indicator 1F 16F 4 10G Off The...

Страница 14: ...0 mm x 207 mm x 41 mm 7 87 in x 8 15 in x 1 61 in QSFP28 ports support both 40G and 4x10G modes 40G ports support DAC QSFP28 ports support 3m cables See Appendix B for details 1 2 4 M6500 FAN F M6500...

Страница 15: ...mart power supply obtaining power status output power current and working temperature in real time RG PA800I F supports both AC and HVDC input Module Appearance Figure 1 10 RG PA800I F Notes 1 Handle...

Страница 16: ...working The alarm may be caused by high power high current high temperature or low fan rotation speed Specifications Model RG PA800I F AC RG PA800I F HVDC Rated Voltage 100V AC to 240V AC 50 60 Hz 24...

Страница 17: ...alance and avoid hurting legs and feet or straining the back When the device is being removed do not hold the power supply handle or the fan handle for these parts are not designed for bearing the ent...

Страница 18: ...0 mA rated leakage action current as an example The rated leakage non action current shall be 15 mA When the leakage current is below 15 mA the protector shall not act Otherwise misoperation may easil...

Страница 19: ...10 4C and its installation accessories Be sure that the dimensions of the cabinet is appropriate for installation of the RG S6510 4C that can reserve a certain space for the front back left and right...

Страница 20: ...the dust content and granularity in the equipment room Substance Concentration Limit particles m 3 Dust particles diameter 0 5 m 3 5 10 6 Dust particles diameter 5 m 3 10 4 Apart from dust the salt a...

Страница 21: ...ng resistance should be less than 1 There is one grounding connector at the right bottom of the chassis of RG S6510 4C series switch The grounding connector is pasted with conspicuous warning labels F...

Страница 22: ...ould pay attention to the Tx and Rx directions of the fiber The Tx end of this device should be connected to the Rx end of the peer device and the Rx end of this device to the Tx end of the peer devic...

Страница 23: ...networking mode power supply and wiring before installation Verify the following requirements before installation The installation location provides sufficient space for heat dissipation The installa...

Страница 24: ...screws of various devices in the cabinet of the same model should be ready and tightened Various boards of the equipment should be installed securely and the fastening screws on the panel should be t...

Страница 25: ...easily Installing Mounting Brackets 1 Take out the two L shape brackets and eight M4 8FMO countersink screws from the plastic package 2 Install the brackets at the side panels of the switch and fix th...

Страница 26: ...de of the chassis Align inner rails with the front of the rack rails Slide the inner rails into the rack rails keeping the pressure even on both sides Secure the rack mount brackets on the chassis wit...

Страница 27: ...Hold the handle at the end of the fan module Insert the fan module to the chassis slowly along the guide rail until it is fully seated and make sure that it is in good contact with the slot 3 Tighten...

Страница 28: ...on module Step 2 Pinch the captive screws on M6500 and rotate the ejector lever outward Align M6500 to the guide rail of the extension module and push it along the rail horizontally and slowly Step 3...

Страница 29: ...PCB or touch the components on the PCB Install a blank panel to the empty slot to prevent dust from entering the switch 3 7 Installing and Removing a Power Module Wear anti static gloves before the f...

Страница 30: ...e well aligned and then insert the module again Removing a Power Module 1 Press the plug of the power module Hold on to the module handle with one hand to pull out part of the module hold the bottom o...

Страница 31: ...ding terminal to the protective earth wire in the building The socket outlet should be installed at a location near the device easy for operation During the device installation always make the ground...

Страница 32: ...power cables you should bind them closely along the chassis downward in a straight line wherever possible 3 12 Installation Verification Verifying the Cabinet Verify if the external power supply matc...

Страница 33: ...RG SS6510 4C Series Switch Hardware Installation and Reference Guide Product Installation 31 To avoid body injury and components damage cut off power supply before checking the installation...

Страница 34: ...jack of the console cable to the serial port of the PC 2 Connect one end of the console cable RJ45 to the console port of the switch Setting Terminal Parameters Step One Start the PC and run the term...

Страница 35: ...w appears as shown in Figure 4 3 In the column of Connect Using field select the serial port you want to use Figure 4 3 After the serial port is selected please click OK The Serial Port Parameter Sett...

Страница 36: ...power cable is correctly connected Check if the power supply voltage complies with the requirement of the switch Check if the console cable is correctly connected the terminal can be a PC used for con...

Страница 37: ...the fault by viewing with the management software When the indicator of the host or the extension module is red or flashing it indicates a failure in which case you need to find out the cause and turn...

Страница 38: ...hen connect the power cables Replacing Lithium Battery The built in lithium batteries can support the real time clock of the RG S6510 4C series switch without external power supply Please contact the...

Страница 39: ...of the switch in the cabinet Check the power connection Check the installation of the power supply module Check the plug in units of each module Check the installation and fastening of the modules Ch...

Страница 40: ...ault 3 The fan tray does not work Fault Description After the system starts the fans in the fan module do not work or the Status indicator is OFF Troubleshooting Check if the connection between the fa...

Страница 41: ...es Fault Description The system runs normally After the fiber interface is inserted into the fiber module and the optical fiber is properly connected the link cannot be set up Troubleshooting 1 Check...

Страница 42: ...CAT6 UTP unshielded wire is exposed in severe condition and influenced by external crosstalk It is recommended to use CAT6A shielded wire or wires with higher specifications for the cabling of the ne...

Страница 43: ...eive Data Output Transmit Data 2 Input Receive Data Output Transmit Data 3 Output Transmit Data Input Receive Data 6 Output Transmit Data Input Receive Data 4 5 7 8 Not Used Not Used Figure A 3 shows...

Страница 44: ...ber Type Core Size m Modular Bandwidth MHz km Max Cabling distance Intensity of Transmitted Light dbm Intensity of Received Light dbm min max min max XG SFP SR MM850 850 MF LC connecto r 62 5 200 33m...

Страница 45: ...P28 Passive SFP28 3 30 25 78125 No 25GE 5m SFP28 Passive SFP28 5 30 25 78125 No Models and Technical Specifications of the 40G QSFP Module The existing 40G QSFP fiber modules Model Wavel ength nm Opti...

Страница 46: ...iber modules Model Wavelength nm Optical Fiber Type Core Size m Modular Bandwidth MHz km Max Cabling Distance DDM Support ed Yes No Intensity of Transmitte d Light dbm Intensity of Received Light dbm...

Страница 47: ...e it to address the practical requirement Precautions for installation Make sure that the PE terminal of the power arrester has been well grounded After the switch AC power plug is connected to the so...

Страница 48: ...and firmly tighten the grounding line to the grounding terminal of the switch 3 Use the multimeter to check whether the grounding line for the arrester is in good contact with the switch grounding te...

Страница 49: ...ternal network cable to the IN end and connect the switch Ethernet port to the OUT end Poor arrester grounding The length of the grounding line should be as short as possible to ensure that it is in g...

Страница 50: ...ion should be over seven times greater than their respective diameters After cabling is fixed the bend radius of a common coaxial cable should be over seven times greater than its diameter The bend ra...

Страница 51: ...t should be smooth without sharp corners The metal hole traversed by cables should have a smooth and fully rounding surface or an insulated lining Proper buckles should be selected to bundle up cables...

Страница 52: ...and 48V power cords cannot be bundled on the guide rails of moving parts The power cables connecting moving parts such as door grounding wires should be reserved with some access after assembled to a...

Страница 53: ...er cables of the same type and in the same cabling direction should be bundled up into cable bunches with cables in cable bunches clean and straight Binding by using buckles should be performed accord...

Страница 54: ...nditions such as windstorm and heavy rain as well as away from dust If the dust is unavoidable keep the door and window away from the pollution source The machine room should be away from the resident...

Отзывы: