Power-on Startup
Checking Before Power-on
The switch is fully grounded.
The power cable is correctly connected.
The power supply voltage complies with the requirement of the switch.
The console cable is correctly connected; the terminal (can be a PC) used for configuration is already started; the
parameters are already configured.
Checking After Power-on (Recommended)
After power-on, you are recommended to perform the following checks to ensure the normal operation of follow-up
configurations.
Check that information appears on the terminal interface.
Check that the device indicator is normal.
Содержание RG-N18010
Страница 1: ...RG N18000 Series Switches Hardware Installation and Reference Guide V1 08...
Страница 89: ...2 RG N18010...
Страница 92: ...2 RG N18010 bracket installed before delivery Figure 3 13 Installing Bracket to Front Chassis Side...
Страница 121: ......
Страница 133: ...Figures of removing fans for RG N18014 supervisor service and switch fabric modules are similar to figure 7 12...